| L1 trigger | p_t cut (GeV) | expected rejection |
| CEM(1,10), CEM(2,5) | one track > 25 | 150 |
| CEM(1,10), CEM(2,5) followed by L3 filter E_T > 12 GeV + shower shape | one track > 12 | 300? |
| mu1ptxwtzxx_fz | one track > 10 | 45 |
| mu1ptxwtzxx_fz | two tracks > 3 | 16 |
Scribe: Terry Wyatt.