Introduction, p11.02.00 Aims and Timescales: Terry Wyatt.
The aim of the build managers is to get p11.02.00 built early next
week.
For L3 we expect to have implemented by then:
-
a large number of bug fixes to the muon track
reconstruction and filter,
-
transverse shower shape cuts for the electron tool,
-
much improved CFT unpacking.
There is some concern that with the huge number of bits of reco code that
will be migrating from p10.15.00 into p11, it may take some time for p11.02
to become stable and fully functional.
This would not be good for L3!
Harry Melanson is aware that we need p11.02 urgently and, if
necessary, he and Alan
will do a partial build of the minimum bits needed for L3.
Gustaaf has been grappling all week with a 2.5 kByte per event memory
leak in the p11.01.00 code currently running on the L3 farm.
The behaviour is quite wierd. No leak apparent on IRIX. Very small
leak apparent offline on Linux, which goes away when the electron tool
is swiched off.
Two new activities:
-
Marumi Kado will work on implementing the hot cell killer NADA into
L3 and adapting it to the needs of online filtering.
-
Andrei Zatserklyaniy is a new member of the L3 algorithms group.
He is interested initially in monitoring the
performance of the muon tool/filter. Welcome!