Guidelines for the testing
of Level 3 Code for new production releases
During the month before the production release is cut:
-
All proposed changes to L3 tools/filters, in particular changes to
trigger list parameters, should be announced in an L3 algorithms
meeting and summarized in a web page.
Here is an example for p13.
-
All relevant changes to the L3 terms in the trigger
database should be made.
-
Full testing using Trigsim, based on a trigger list extracted
from the trigger database
should be performed.