p20-10-00 build 4 - 10 July 07 jet_evt p20-br-02 <- p20-br-01 Modify the access to the trigger tower energies when calculating the variables used for the L1 confirmation of jets. It now uses a new (and faster) method which automatically takes into account the cabling problems in stores 5435-5533 l1l2_evt p20-br-14 <- p20-br-12 Add a new method which allows fast access to the L1 calorimeter trigger towers and takes into account a cabling issue for stores 5435-5533 (this method is used in the jet reconstruction while calculating the variables for the L1 confirmation of jets) Keep track of the routing master copy of the L2 bits (to be used to diagnosed problems with the trigger framework). Add method for identifying problems in the Run2B L1Cal trigger on a event by event basis. l1l2_reco p20-br-28 <- p20-br-26 Keep track of the routing master copy of the L2 bits (to be used to diagnosed problems with the trigger framework). l2gblworker p20-br-07 <- p20-br-06 Fixed script overflow problem. fillScriptData returns TRUE when a script has overflowed, not false! Added fix to set the number of scripts stored in the L2 global header data block correctly.