======================================================== p16.02.00 - build 1 6 Apr 04 Synchronize with the l2p16.02.00 release that is currently online. Level 2: buchanan Purpose: - muons - new LUT - make (finally) the L2 muon efficiency distribution flat - no asymmetries, plus correction in using scintilator timing information [l2slic_driver] - global - new track tool variable for STT people - chi2 [l2gbltrack] - tracking - added yet another, the last one, tracking worker, STT IP [l2trackworker, l2admin] - also, there is a fix in l2io package for correct limit on max. number of tracks; found by Norm [l2io/l2stt.iogen] - plus, few fixes in L2 online package to have better diagnostic error messages when something goes wrong with L2MUC/L2MUF [l2vme, l2pci, l2linux] l2cpsworker p16-br-01 <- v00-02-15 Bug fixed for reading in the CPS axial messages l2gblbase p16-br-01 <- v00-00-11 added IP tracks to configuration file l2gbltrack p16-br-03 <- p16-br-02 p16-br-01 added ability for a chi squared cut added ability to cut on ipsig in tool take advantage of order of input tracks l2io p16-br-04 <- p16-br-03 modified l2stt.iogen changed max number of CTT and STTtracks from 46 to 48. l2cttcftworker p16-br-00 <- v03-00-00 l2sttcttworker p16-br-00 <- v01-01-03 l2sttipworker p16-br-00 <- v00-01-02 Fix output.evigen and added l2sttcttworker/fetchSTTPT.hpp, so that tracks are passed to global sorted from the internal array and not as they arrived to the worker. l2slic p16-br-01 <- v00-06-21 central algorithms: Added new bottom C-counters to MSC-unpacker code (no algorithm changes) MSC and PIX unpackers: bug fix (negative scintillator times were reported as "1") l2slic_tables p16-br-01 <- v00-04-00 Added bottom C-hole counters (CPZ5, CPZ6) l2trackworker p16-br-02 <- p16-br-01 Add the part for the "last" tracking worker - STT IP. L2CTT now runs three workers: STT PT, CTT and STT IP. == Level3: bellavan l3fTauTools p16-br-04 <- p16-br-03 changed NN weights (RCP file) to extend acceptance to |eta|>1.5 l3fanalyze p16-br-09 <- p16-br-08 make name of muon geometry file an RCP variable; update from "MuoBaseGeometry" to "MuoBaseGeometry_feb03" == D0Reco: suyong muon_index p16-br-01 <- v01-01-02 Update to read out newly installed C-hole counters. tmb_tree p16-br-03 <- p16-br-01 tmb_tree_maker p16-br-01 <- v00-11-00 add more CPS information to TMBEmcl. == MonteCarlo: muanza/sceno pomwig p16-br-02 <- v00-01-00 fix label of diffracted outgoing particles and move to Herwig6.5 The Herwig version was removed from the fortran files so that the object files are created with the correct name to be linked. == Online: jonckheere read_event_daq p16-br-01 <- v00-09-01 Fix ordering of d0om initialization. ======================================================== p16.02.00 build 2 - 6 Apr 04 == Level 3: bellavan l3ftrigger_base p16-br-07 "p16-br-05 Fixed a problem in the TriggerConfiguration component test. It just needed updating to deal with a more strict policy in the L3TrigClient about how much information must be provided before it can be set into a configured state. Fixed a mistake in the TriggerConfiguration::StopRun method. The list of active bits maintained by each client and used to remove l2 bits and their corresponding filter scripts from the L3TriggerList was being wiped before being used meaning that references to filter scripts were persisting beyond a stop_run and clear_client. A one line fix to read the values before they were wiped fixes the problem ========================================================