Reprocessing: Meeting of 1-Nov-2004: 9:30-10:30 ESNet video conference

Our meeting number on the ESNet is 823073776 (82d0repro).
Instructions to dial into a video conference via phone.

Agenda

  1. News
  2. Status of Installation at Imperial (Frederic Villeneuve-Seguier)
  3. Stress Tests on the D0Farm over the weekend (Daniel Wicke)
  4. Status of Implementation of Reprocessing in JIM (update)
  5. Coordination of JIM Deployment to Remote Site
  6. AOB.

Minutes

Participants

Laurent Dulflot, Wyatt Merrit, Ian Bertram, Gabriele Garzoglio, Mike Diesburg, Steve Timm, Joe Steele, Daniel Wicke, Jae Yu, Phil Lewis, Yann Coadou, Dugaon O'Neil

Topics

  1. News
    p17.01 build has trouble cause of using gcc3.4.
    d0reco doesn't work with SAM-manager, and 3 more bugs. Expectation 1 week to fix this.
  2. Status of Installation at Imperial (Frederic Villeneuve-Seguier)
  3. Stress Tests on the D0Farm over the weekend (Daniel Wicke)
    Good progress, but improvements still neccessary.
  4. Status of Implementation of Reprocessing in JIM (update)
  5. Coordination of JIM Deployment to Remote Site

    Status of sites

    Manchester: Sabah, but installation is done by Gabriele
    GridKa: Jörg is available
    WestGrid: JIM close to work (authentication problems). SamBatchAdapter working.
    SAR: Interfacing to MCFarm unclear.

    Deployment plan

    1. WestGrid (Contact: Yann Coadou)
    2. GridKa (Contact: Jörg Meyer)
    3. ...

  6. AOB.

Next Meeting

15-Nov-2004
Mike Diesburg, Daniel Wicke, 29-Oct-2004. Last Change 1-Nov-2004.
Diesburg@fnal.gov, Wicke@fnal.gov