Reprocessing: Meeting of 1-Nov-2004: 9:30-10:30 ESNet video conference
Our meeting number on the ESNet is 823073776 (82d0repro).
Instructions to dial into a video conference via phone.
Agenda
- News
- Status of Installation at Imperial (Frederic Villeneuve-Seguier)
- Stress Tests on the D0Farm over the weekend (Daniel Wicke)
- Status of Implementation of Reprocessing in JIM (update)
- Coordination of JIM Deployment to Remote Site
- AOB.
Minutes
Participants
Laurent Dulflot, Wyatt Merrit, Ian Bertram, Gabriele Garzoglio, Mike Diesburg, Steve Timm, Joe Steele, Daniel Wicke, Jae Yu, Phil Lewis, Yann Coadou, Dugaon O'Neil
Topics
- News
p17.01 build has trouble cause of using gcc3.4.
d0reco doesn't work with SAM-manager, and 3 more bugs. Expectation 1 week to fix this.
- Status of Installation at Imperial (Frederic Villeneuve-Seguier)
- Stress Tests on the D0Farm over the weekend (Daniel Wicke)
Good progress, but improvements still neccessary.
- Status of Implementation of Reprocessing in JIM (update)
- Coordination of JIM Deployment to Remote Site
Status of sites
Manchester: Sabah, but installation is done by Gabriele
GridKa: Jörg is available
WestGrid: JIM close to work (authentication problems). SamBatchAdapter working.
SAR: Interfacing to MCFarm unclear.
Deployment plan
- WestGrid (Contact: Yann Coadou)
- GridKa (Contact: Jörg Meyer)
- ...
- AOB.
Next Meeting
15-Nov-2004
Mike Diesburg, Daniel Wicke, 29-Oct-2004. Last Change 1-Nov-2004.
Diesburg@fnal.gov,
Wicke@fnal.gov