Reprocessing: Meeting of 10-Jan-2005: 9:30-10:30 ESNet video conference
Our meeting number on the ESNet is 823073776 (82d0repro).
Instructions to dial into a video conference via phone.
Agenda
- News
- Status of Implementation of Reprocessing in JIM (update)
- JIM Deployment and Remote Setup
- Certification of Sites (DW)
- AOB.
Minutes
Participants
Patrice Lebrun (Lyon), Jae Yu (SAR),
Gavin Davies, Frederic (IC London),
Yann Cadou (Vancouver),
Anoop, Laurent Duflot, Joerg Meyer, Mike Diesburg, Andrew Baranovski, Joe Steele, Daniel Wicke (FNAL)
Topics
- News
p17.03.00 to be build today. Calo DB to be updated today.
Certification to be started after DB is stable; probably with p17.03.00.
- Status of Implementation of Reprocessing in JIM
Implementation of production and merging is more or less done.
Production scripts are now available via ups/upd.
- JIM Deployment and Remote Setup
- DØFarm: Up to date
- GridKa: Broken since 17-Dec-2004 (problem still not resolved, going to have a meeting with GridKa Admin Jos van Wesel.).
- Lyon: 15TB transfered. Test of p17.02.00 failed (probably need update of packages).
Also a problem of back transport of stdin/out.
- SAR: ~15TB transefered. Test of p17 (p14?) succeeded.
- WestGrid: Couldn't switch to new SAM station, because of private network issues.
(Can we switch back to the non-optimal setup? Will investigate optimised setup for a few more days.)
- Wisconsin: --
- UK: IC: Problems due to SAM station being on SGI. New SAM station on Linux being configured.
JIM seemed to be working.
Lancester: Peter Love (ask Iain)
Sabah Salih will work on Manchester
Peter Love and Frederic will bring up Rutherford
- CMS Farm: ??
- Prague: --
- Certification of Sites
DW has started to describe the
certification procedure.
The production certification has to be run by manually calling 'samg'.
The merge certification can be run using the
provided production scripts.
As stated above, because of ongoing DB updates we can't run certification at the moment.
- AOB.
Whenever testing the production step with p17 versions
use the test_run = true line in the JDF or the --test in the production scripts.
Action Items:
Next Meeting
Due to public holidays on 17-Jan-2005, the next meeting will be on 24-Jan-2005.
Mike Diesburg, Daniel Wicke, 7-Jan-2005. Last Change 12-Jan-2005.
Diesburg@fnal.gov,
Wicke@fnal.gov