P14 Reprocessing: Meeting of 10-Mar-2004: 10:15-11:30 VRVS Forest (moved to CERN telephone conference).
Agenda
- News
- Status of remaining file transports (Nikhef, UK)
- Writup of reprocessing experiences (Daniel)
- Runjob (Dave Evans)
- AOB.
Minutes
Participants
Mike Diesburg, Dave Evans (FNAL), Ian Bertram, Peter Love (Lancester), Daniel Wicke (Wuppertal),
Jae Yu (Arlington).
Topics
- News
Vanilla node setup at FNAL to test (currently for Ian)
Ian will test new verions on Runjob on this.
Peter has worked on the merging problem
DB Proxy currently needs to be set in a rcp. But now can be set as an evironment variable
- Status of remaining file transports (Nikhef, UK)
--
- Writup of reprocessing experiences (Daniel)
New draft available.
Need help on paragraphs that describes
- Runjob functionality of last summer. (=> Ian et al.)
- d0reco requirements of pre p14.04.00 versions. (=> Mike looks for people)
- Hardware setup and software configuration of the different sites. (=> all)
- How the organisation/planning was done before Beaune and until September. (=> Mike looks for people)
- Runjob (Dave Evans)
Reported on runjob version "7" (in fact a new package).
Moved to a GRID friendly way. Monitoring interface.
A first prototype is expected at the end of April.
In the meeting we didnīt see any reason not to try the new version in case of failure we can stick to the current mc_runjob.
- AOB:
SAR: Jae: Has done the certification dataset p14.05.02 on SAR with McFarm (can send merged TMBs).
JAE will contact Phil to create plots.
Action Items:
see above
Next Meeting
17-Mar-2004. 10:15-11:30CST.
Mike Diesburg, Daniel Wicke, 2-Mar-2004. Last Change 10-Mar-2004.
Diesburg@fnal.gov,
Daniel.Wicke@physik.uni-wuppertal.de