P14 Reprocessing: Meeting of 26-Nov-2003: 10:05-11:00 VRVS Island.
Agenda
- Status of Sites.
Minutes
Participants
Dugan O'Neil (Vancouver), Jeremy Herr (Ann Arbor), Daniel Wicke (Wuppertal), Gavin Davies (London),
Willem van Leeuwen (Amsterdam),
Thomas Nunneman (Munich), Philip Lewis (FNAL),
Willy Porlier (Paris), Patrice Lebrun (Lyon).
Topics
- Site Reports:
- Farm:
- GridKa: Around 200CPUs working for us.
- Lyon: Reproccessed ~4M events of 16M. TMBs transfered to FNAL,
keeping DSTs at Lyon (declared in SAM). Using around 100-150CPUs.
- Nikhef: Dismatling EDG testbed and building LCG testbed (400GHz, available next week(?)).
Using SARA storage element.
- NPACI: -
- SAR: -
- UK: RAL and Imperial is running (190GHz) most TMBs transfered. Some problems with DSTs transfers related to gridftp. Certification run at Manchester is almost complete.
- WestGrid: Certification set ready. Plots to be made.
Transport done from d0mino instead of local neighbouring site.
200*GHz CPUs could go up with more power in the building.
Action Items:
Next Meeting
Mike Diesburg, Daniel Wicke, 19. Nov. 2003. Last Change 26. Nov. 2003.
Diesburg@fnal.gov,
Daniel.Wicke@physik.uni-wuppertal.de