Reprocessing: Meeting of 31-May-2005: 9:00-10:00 ESNet video conference
Our meeting number on the ESNet is 823073776 (82d0repro).
Instructions to dial into a video conference via phone.
Agenda
- News
- Status of remote site Certification
- Status of production
- JIM Deployment and Remote Setup of remaining sites.
- AOB.
Minutes
Participants
Peter Love (Lancester), Sabah Salih (Mamchester), Joel Snow (Oklahoma),
Gavin Davies (IC), Joerg Meyer, Mike Diesburg, Daniel Wicke (FNAL);
Gabriele, Parag joined 9:30.
Topics
- News
- New release of d0repro (v1_2_3). Production sites should upgrade!
- improved check_merge
- new tar-ball
- Major network outage at FNAL Monday morining (2hours)
- 2004 data are being started. Some of these files are much bigger,
which might require longer queues
- Status of production
- WestGrid: (Mail by Dugan: to be included)
- Lyon: (Mail by Tibor: to be included)
- SAR-UTA: (Mail by Jae: to be included)
- SAR-Oscer: : Oscer working pretty well.
Submission to wisconsin; missing datasets -> Mike will (re)sent.
Also fo the CMS farm.
- Prague: Problems to store to durable location; tried add a new location (why?)
- Status of remote site Certification
- Status of production certification.
- UK: IC: Plots available
- CMS Farm:
- Status of Merge Certification of Sites
- GridKa: done.
- UK: IC:: Stuck in merging: Can't store results to sam.
- UK: Manchester: plots available (to be sent to Laurent today).
Datasets for prestaging to be remailed.
Need to wait for Laurent approval before starting production.
- CMS Farm: Overlay plots should become available this afternoon.
- JIM Deployment and Remote Setup of remaining sites.
- GridKa: No progress on NFS problems: Ask representatives for revised estimate of contributions
- RAL: Ongoing (week-ish time scale to start tests)
- Lancester: SAMGrid being installed, SAM station to be done.
- AOB:
- We're planning to
- Vancouver (Fr. 2pm):
The following poeple are planning to participate: Joel, Joerg, Gavin, Frederic (?), Yann, Dugan.
Action Items:
Next Meeting
6-June-2005.
Mike Diesburg, Daniel Wicke, 26-May-2005. Last Change 26-May-2005.
Diesburg@fnal.gov,
Wicke@fnal.gov