P14 Reprocessing: Meeting of 5-Nov-2003

Agenda

  1. Storing DSTs to tape.
  2. Finalising certification for GridKa, Lyon and UK.
  3. Problems of file delivery.
  4. Status of Sites.

Minutes

Participants

Willem van Leeuwen (Nikhef), Rod Walker (Imperial), Daniel Wicke (Wuppertal), Jae Yu (SAR), Thomas Nunnemann (Munich), Mike Diesburg (FNAL), Phil Lewis (FNAL), Ian Bertram (FNAL), Jeremy Herr (Ann Arbor, NPACI), Francicso Obispo (Caracas), Daniel Bresson (Lyon), ...

Topics

  1. Storing DSTs to tape:
    We will try storing DSTs directly to FNAL. This needs areful observation, to avoid bandwidth problems.
  2. Finalising certification for GridKa, Lyon and UK
    Harry and Suyon need to look at Recocert histos, should send a mail to the list when a certain site is certified. (Answer expected later today) Lyon produced unselected TMBs, which can be used to make a full comparison with FNAL. Thereafter selective TMBs from Lyon can serve as "master histograms" as event lists are already approved. (Phil checked all event lists.)
  3. Problems of file delivery
    Two problems may be overlapping here:
    1st: The cache on the central-router is not very large (~280GB) and had a lot of files in it. It is possible that a single slow remote station could throttle transport for everyone. We will look into expanding size of cache.
    2nd: SAM production databases and the ADIC robot were both down part of the day on Tuesday. This was normal maintenance Regular maintenance days are the first Tuesday of every month. People should expect delays on these days. We will have notices of significant downtimes sent to the reprocessing mail list.
  4. Site Reports:

Action Items:

Contact Harry and Suyong to bless certification histograms (Mike).
Trace transport bottleneck (Mike, Ian)

Next Meeting

12-Nov-2003: VRVS
Mike Diesburg, Daniel Wicke, 5. Nov. 2003. Last Change 5. Nov. 2003.
Diesburg@fnal.gov, Daniel.Wicke@physik.uni-wuppertal.de