Reprocessing: Meeting of 7-Feb-2005: 9:30-10:30 ESNet video conference
Our meeting number on the ESNet is 823073776 (82d0repro).
Instructions to dial into a video conference via phone.
Agenda
- News
- Status of p17.03.00
- Status of Merge Certification of Sites
- JIM Deployment and Remote Setup
- AOB.
Minutes
Participants
Sabah Salih (Manchester), Jae Yu (SAR), Tibor Kurca (Lyon), Joe Steele, Wyatt Meritt, Gabriele Garzoglio, Iain Bertram, Jörg Meyer, Mike Diesburg, Daniel Wicke (FNAL)
Topics
- News
New releases of JIM are pending with improvements aiming at easier debugging.
- Status of p17.03.00
Waiting for calorimeter to finalise their calibration constants.
Current build is #5.
No estimate for freeze yet. (Update in operations meeting)
- Status of Merge Certification of Sites
Problems with routing to CAB solved with Robert.
So far D0Farm and Lyon are submitted to create merge datasets
- JIM Deployment and Remote Setup
- GridKa: GridFTP problems fixed by reconfiguration. Name service problem remaining (slows down sam station alot).
- Wisconsin: Currently at most 33CPUs. Asked to increase D0 priority.
- Prague: Reconstruction jobs work at 80% efficiency.
- UK: Manchester: Reinstallation started
London: Intrastation transport available now. Batch adapter is now programmed.
- AOB:
Did the calorimeter db proxy issues been solved?
Yes. (Some parameter missing at FNAL).
How ist CPS db problem solved?
When p17.03.00 becomes available we will run on d0farm first and compare the results from standard scripts
with those produced with JIM. After that is successfull we'll start site certification.
Action Items:
Get merge certification done. ASAP.
Next Meeting
14-Feb-2005.
Mike Diesburg, Daniel Wicke, 3-Feb-2005. Last Change 7-Feb-2005.
Diesburg@fnal.gov,
Wicke@fnal.gov