Reprocessing: Meeting of 7-Mar-2005: 9:30-10:30 ESNet video conference
Our meeting number on the ESNet is 823073776 (82d0repro).
Instructions to dial into a video conference via phone.
Agenda
- News
- Status of central production certification.
- Status of RecoCert (David Lamb)
- Status of Merge Certification of Sites
- JIM Deployment and Remote Setup
- AOB.
Minutes
Participants
Yann Coadao (Vancouver), Jae Yu (SAR), Frederic Villeneuve-Seguier (IC), David Lamb (Notre Dame), Laurent Duflot, Thomas Nunnemann, Gabriele Garzoglio, Jörg Meyer, Daniel Wicke (FNAL)
Topics
- News
- New SAMGrid release cut with improved merging logic (recertification per site not required, but testing would be welcome please rerun the merge certification datasets after upgrading with p17.03.01-test).
- p17.03.02 still not built yet.
- Status of RecoCert (David Lamb)
(Slides:PDF, PPT)
- Status of central production certification.
Overlay plots for a reduced number of files
(12 out of 99) were created with RecoCert from p17.03.01.
They show minute deviations except in plots known to be buggy. Laurent blessed these plots as sufficient to certify the infrastructure itself.
- Status of Merge Certification of Sites
- DØFarm: done.
- WestGrid: reco cert (p17.02.00) for first merged dataset running. Plots expected Tuesday or Wednesday.
- Lyon: done
- SAR: UTA: done
- GridKa: reco cert (p17.02.00) for first unmerged dataset done.
- Wisconsin: reco cert (p17.02.00) for first unmerged dataset running. Plots expected later today.
- JIM Deployment and Remote Setup
- GridKa: Configuration of DB proxies under investigation. SAM_NAMING_SERVICE isn't set correctly by sam_config. (Discussion to be continued offline)
- Prague: Transfer of d0 code tarball hangs in the gridftp transport from the cache to the worker node. Under investigation.
- UK: IC: SAM station fixed. Firewall typo fixed. Testing continues...
Manchester: Initial tests succesfull.
- CMS Farm: Seems up to date, under test.
- AOB:
--
Action Items:
WestGrid and SAR will wait for running production certification until we have the new release cut (later today).
Next Meeting
14-Mar-2005.
Mike Diesburg, Daniel Wicke, 21-Feb-2005. Last Change 5-Mar-2005.
Diesburg@fnal.gov,
Wicke@fnal.gov