Reprocessing: Meeting of 7-Nov-2005: 9:30-10:30CDT ESNet video conference

Our meeting number on the ESNet is 883073776 (88d0repro).
Instructions to dial into a video conference via phone.

Agenda

  1. News
  2. Status of reprocessing production
  3. New JIM release cut (October release cut; fixed installation scripts, fixes to improve job throtteling)
  4. MC Issues
  5. AOB.

Minutes

Participants

Cano Ay (Mainz), Tibor Kurca (Lyon), Frederic (London), Eduardo Gregores(?) (Brazil), Gabriele Garzogio, Joe Steele (FNAL), Joel Snow (Oklahoma), Daniel Wicke (Wuppertal)

Topics

  1. News

  2. Status of production

  3. Timeline for recovery Need to give some time for recovery of the Imperial datasets.

    Recovery steps should start in 2 weeks from now.

    This requires new SAM dimension. Gabriele will talk to Adam about the status.

  4. MC Issues

    Joel would like to have bar chart adapted to show MC productioni status

    Willem noticed that mc_runjob creates wrong filenames. Need to contact mc_runjob experts (Iain Bertram didn't reply yet).

    Joel reported problems sam_config v7_1_2 (latest version). IOR are handled differently, it doesn't work with JIM, a JIM upgrade will be provided for the new cut.

  5. New JIM release cut

  6. AOB:

Next Meeting


Mike Diesburg, Daniel Wicke, 28-Oct-2005. Last Change 11-Nov-2005.
Diesburg@fnal.gov, Wicke@fnal.gov