P14 Reprocessing: Meeting of 3-Dec-2003: 10:15-11:00 VRVS Moon.
Agenda
- Status of Sites.
Minutes
Participants
Dugan O'Neil, Roger Moore, Gavin Davies, Daniel Wicke
Topics
-
Apologies for the late anouncement of the meeting.
-
Apart form the status reports no item was brought up to the agenda.
Therefore and due to the bad quality of the conection we decided to stop the meeting
and have the site reports by email:
- Site Reports:
- Farm: -
- GridKa: All assigned datasets (containing approx. 6600 files and 13M events) have
been reprocessed at GridKa.
After several stages of re-re-submission (~1000 failures due to file
server crashes and other file system problems) the following failures
persist (out of 6600 files):
- 49 files with status non-available (no location declared in SAM)
- 9 files on bad tape (status not allowed, i.e. severe tape problem)
- 1 genuine reco crash (in evpack checksum test)
- Lyon:
Total number of DST files: 11927
Total Events Transfered: 16498946
Total files reprocessed: 5150 / 11927
Total Events produced: 9840661 (60 % of all dataset assigned to ccin2p3)
about 1 M evts per day are reprocessed
2 jobs re-submitted sucessfully due to virtual memory exceeded (> 1GB) max
changed to 2 GB for these jobs,
1 job has input corrupted only 1025 evts are read and reprocessed on 1672
declared in sam (waitting for decision about the output files !!)
- Nikhef: -
- NPACI: -
- SAR: -
- UK:
~2750 files reprocessed (5.4 M events)
of which ~1400 DSTs shipped back to FNAL
Notes:
had some problems earlier this week resulting from upgrade of sam_gridftp
still running certification sample on manchester site
- WestGrid:
Action Items:
Next Meeting
10-Dec-2003, 10:15 CST.
Mike Diesburg, Daniel Wicke, 3. Dec. 2003. Last Change 3. Dec. 2003.