Reprocessing: Meeting of 12-July-2004: 9:30-10:30 ESNet video conference
Our meeting number on the ESNet is 823073776 (82d0repro).
Instructions to dial into a video conference via phone.
Agenda
- News
- Status of DB installation (Thomas Nunneman (TBC)/All)
- AOB.
Minutes
Participants
Dugan O'Neil (Westgrid), Thomas Nunnemann (Munich), Jae Yu (SAR), Tibor Kurca (Lyon), Joe Steele, Vlastislav Hynek, Mike Diesburg, Daniel Wicke (FNAL), Gavin Davies (UK) .
Topics
- News:
- Status of DB installation (All)
FNAL Farm ok,
GridKa ok,
Lyon ok,
NIKHEF/LCG,
SAR
to be installed on the biggest farm, other sites should access through that. Firewall will be the only problem. Thomas has info about required ports.
UK (TBA),
Westgrid, OK
- AOB:
RAW data distribution:
GridKa wants to prestage.
Lyon want to prestage (lots of space)
SAR wants to prestage (20TB but not permanent).
Westgrid wants to prestage (150TB tape, not yet tested)
Prague is investigating on whether and how to join the reprocessing effort.
Next Meeting
26-July-2004 9:30-10:30CST.
Mike Diesburg, Daniel Wicke, 6-July-2004. Last Change 12-July-2004.
Diesburg@fnal.gov,
Daniel.Wicke@physik.uni-wuppertal.de