P14 Reprocessing: United Kingdom

Contacts

Iain Bertram (bertram@fnal.gov), Gavin Davies (g.j.davies@ic.ac.uk)

Imperial: Rod Walker (rodney.walker@ic.ac.uk)
Manchester: Sabah Salih (sabah@hep.man.ac.uk)
Rutherford: Rod Walker (rodney.walker@ic.ac.uk)

Parameters

Imperial
Manchester
Rutherford
CPU (1GHz PIII equivalent) promised: 80
90
90
CPU (1GHz PIII equivalent) estimated: 160
90
170(in Sep.)
RAM/CPU: 512MB(mostly)
1GB
512MB
SAM Cache: 100GB
300GB
1.2TB
Stageout disks: 300GB
300GB
420GB
Network to FNAL:
7MB/s (shared)

Stationname imperial-lesc
manhep
d0rutherford

Status

18-Nov-2003: Certification dataset for Imerial and RAL processed with p14.05.02 and recocert plots available on d0mino.

21-Nov-2003: Certification dataset for Imerial and RAL blessed by Harry and Suyong.

Started reprocessing shortly afterwards.

7-Jan-2004: Finished all assigned datasets (19.5M events). Around 1000TMBs to be copied to d0mino. Most DSTs in SAM at FNAL.


Daniel Wicke, 30. Sep. 2003. Last Change 12th. Dec. 2003.
Daniel.Wicke@physik.uni-wuppertal.de