P20 Reprocessing Joel was concerned about using the condor pool at OU for p20 testing. It was mentioned that TopDawg could be used for the test. However, if GLOW is planning to be used, then in principle the condor pool at OU could also be used, depending on local job pre-emption policies. The forwarding mechanism is in place and can be used. Joel volunteered to run operational tests in November. Gabriele sent out some question about the upcoming processing: -Monitoring progress. Mike will set this up. -Organization of datasets. Mike will provide the daysets. The plan is to use the same method as was used during the last reprocessing. Running operations. We will need to identify the people who will be submitting jobs, checking jobs etc. **Action item for Tibor** -Operational tools. Daniel did not think that there should be many changes necessary to use the tools previously used. If any tools need to be modified, Daniel will do this. Liason with OSG. Tibor will be the liason. In the situation that Tibor is not available, Brad will be the deputy. Chris Green is looking into the OSG resources necessary to run our p20 reprocessing.