| Total Raw Events | 7180 | |
| Unmerged Events | 7165 | |
| Merged Events | 2756 | |
| Contribution | ||
| Total Raw Events | 4293 | |
| Unmerged Events | 4285 | |
| Merged Events | -122 | |
| Contribution | ||
Reco Processing Estimates as of 10/23/2011
Expected production rate with 992 CAB slots : 6.51 M events/day
Oldest active data from :
Unprocessed backlog as of 10/23/2011 : 0.00 M events
Days left of run : -23
New data expected @5.92 M events/day : 136.16 M events
Days to finish @6.51 M events/day : 30
Expected completion date : Tuesday, Nov 22 2011
Rate needed to complete by 10/21/2011 : 4.12 M events/day
CAB Slots needed to reach 4.12 M rate : 185
Dataset Completion Audit
Description of Audit Information
Daily totals (ps) (jpg)
Daily merged totals (ps) (jpg)
Cumulative progress (ps 1)
(ps 2)
(jpg 1)
(jpg 2)
Cumulative progress (2009 only, renormalized) (ps 1)
(ps 2)
(jpg 1)
(jpg 2)
Cumulative progress (post 2009 shutdown, p20.16.0[5678] ,renormalized) (ps 1)
(ps 2)
(jpg 1)
(jpg 2)
Cumulative progress (post 2010 shutdown, p20.18.00 ,renormalized) (ps 1)
(ps 2)
(jpg 1)
(jpg 2)
Daily Unmerged totals (ascii list)
Daily Merged totals (ascii list)
Cumulative Unmerged totals (ascii list)
Ganglia Plots
Submission stats for May data
Submission stats for Sep data
Average Iniital Luminosity (ps) (jpg)
D0reco Timing vs Luminosity (ps) (jpg)
PBS Job Efficiency (ps) (jpg)
Raw vs TMB Event Size (ps) (jpg)
Event Size vs Luminosity (ps) (jpg)
Daily Average TMB Size (ps) (jpg)