Verification 2 of t00.59.00

D. Adams
20oct99 1350


Track finding was done using the final build of t00.59.00. The usual 50, 3 and 1 GeV muon events were reconstructed.

The CFT digitization code has been fixed. The starting z-position is now smeared.

Here are the results for CFT+SMT:

 run   CPU   eff  fake  misr  fcsq  mcsq  nclu
----  ----  ----  ----  ----  ----  ----  ----
m50   .258  .990  .000  .001  19.2   6.3  19.5
m03   .259  .989  .000  .001  20.1  10.2  19.5
m01   .255  .931  .000  .004  24.9  12.0  19.4


adams@rice.edu