D0 global tracking results for t01.03.00

D. Adams
07jul00 1600


Previous results were for t01.02.00.

Here we present results for t01.03.00. The SMT layer propagation is faster.

Here are results for muons (pT > 10 GeV/c) from Z's in Pythia Z -> mu mu with zero to six background events. These are our MC certification events.


Plots also show the found, lost, and misreconstrued muons from Z's and the fake tracks with pT above 10 GeV/c. The figures include curves showing the subdetector boundaries. The central horizontal band is the CFT acceptance. The thin bands above and below are the overlap region. The regions above the top V and below the bottom V are the SMT forward acceptance. There are also regions in the upper left and lower right between the CFT overlap and the SMT forward which are not covered. These are the "gaps".

pzmm + 6 bg  found and lost
pzmm + 6 bg  misrecos and fakes


The numbers used to construct the above plots may be found in the log file.


Comments

The CFT CPU time is significantly reduced but remains large.


dladams@fnal.gov