This is a list of Presentations at Muon Upgrade Meetings
Copies of Most slides are available at DAB6 (see Tom or Dmitri)
List of Items in All Muon Upgrade Meetings since December, 1999
November 7, 2001
PDT Time-To-Distance Analysis (Chun-Hui Luo)
Offline Muon Calibration Software Status (Antoine Kouchner)
PDT Status (Markus Wobisch)
Central Muon Scintillator Counter Commissioning and Calibration (Steve Doulas)
Pixel Status and FAMUS Special Runs (Andrei Schukin)
L1Muo Status (Jeff Temple)
MDT Status (Bassar Sabirov)
September 14, 2001
Status of Muon Detectors (Bassar Sabirov)
PDT Status & Plans (Diehl)
Status and Plans for L2 (Arthur Maciel)
Muon L1 Status & Plans (Rob McCroskey)
Segment B+C and Scintillator Matching ()
Performance of Local Tracking Fit in FAMUS (Daria Zieminska)
WAMUS Data and reconstruction (Raimund Stroehmer)
Software Release Status (Linda Stutte)
Status of Alignment/Calibration (Jundohng Zhang)
July 25, 2001
Combined Detector Status Talk (Bassar Sabirov)
PDT Drift-time-to-distance Calculation (Bernardo Gomez)
MDT Plane Efficiency in Tracking (Yuri Yatsunenko)
AC Layer Coincidence Studies in Minbias Events (Sudeshna Banerjee)
Progress in the muon segment linked-list algorithm (Onne Peters)
Muon Tracking Status (Frederic Deliot)
May 25, 2001
L1 Muon Trigger Status and Commissioning (Rob McCroskey)
L2 Muon Trigger Status and Commissioning (Arthur Maciel)
L3 Muon Trigger Status and Commissioning (Paul Balm)
Triggers for Muon Detector Commissioning (Tom Diehl)
April 25, 2001
Calibration Overview (Darien Wood)
Database and Browser (Jundong Huang)
Downloading PDT's from Database (Neeti Parashar)
Secondary Daq Status (Dennis Shpakov)
Unpacking and Error Checking (Mike Fortner)
Muon Tracking Plans (Dave Hedin)
April 14, 2001
Agenda for PDT Readiness Review (Tom Diehl)
Gas System (John Krider)
Cables (Tom Marshall)
High and Low Voltage (Tom Diehl)
Electronics (Herman Haggerty)
Monitor and Control (Tom Diehl)
MCH3 Readout (Tom Diehl)
Examine (Dave Hedin)
Survey (Al Ito)
March 2, 2001
LED Fiber Pulsing Calibration in the Cosmic Cap (Shashi Dugad)
PDT Control Board Installation Progress (Tom)
February 7, 2001
Introduction (Tom)
Anticipated Detector Status (Dmitri)
Muon Offline (Daria Zieminska)
L3 CFT Tracking Tool (Ray Beuselinck)
L1 Trigger (Ken Johns)
L2 Trigger (Arthur Maciel)
Muon L3 Tool (Dave Hedin)
Calibration Database (Jundong Huang)
Scintillator Calibration (Shashi Dugad)
Summary (Tom)
January 19, 2001
Central Muon Installation Status (Tom Diehl)
Pixels and MDT Installation (Linda Stutte) verbal
Pixels and MDT Commissioning Status Pre-Roll-In (Dmitri)
Control Boards (Sten Hansen and Boris Baldin) verbal
January 5, 2001
Pixels and MDT Installation (Linda Stutte)
Pixels and MDT Commissioning Status and Plans (Dmitri Denisov)
Muon Electronics Support in Run II (Boris Baldin)
Central Muon Scintillator Commissioning (Steve Doulas)
Cosmic Ray Running (Jaehoon Yu)
December 8, 2000
Muon Level 2 Trigger Introduction (Arthur Maciel)
SLIC Status testing reports and plans (Arthur for Burair)
The physics algorithm - hardware interface (Arthur)
Overview and Status of Muon L2 Simulator (Christos Leonidopoulos)
Overview and Status of Central mu-stub finding (Sergey Ouzonian)
Forward stub finding progress report (A layer) (Raimund Strohmer)
Forward stub finding progress report (BC layers) (Tim Christiansen)
November 10, 2000
A Layer MDT Trigger (Raimund Strohmer)
B+C Layer MDT L2 Trigger (Tim Christiansen)
Central Muon L2 Trigger (Sergey Ouzonian)
Forward Muon Installation Progress (Linda)
LED Pulser and Scintillator Readout (Steve Doulas)
Event Display Picture (Nobu via Daria)
Central Muon Commissioning and News (Tom Diehl)
Magnetic Field Calculations (Vladimir Korablev)
Progress in the Calibration Database (Andrzej Zieminski)
October 11, 2000
MCH3 Cable Installation (Tom Marshall)
Forward Muon Installation Schedule (Henry Lubatti)
L1 Trigger Update (Rob Mccrosky)
L3 Filter Commissioning Progress and Plans (Paul Balm)
Pixel Octant Readout and Commissioning (Igor Vasilyev)
MDT Commissioning (Bassar Sabirov)
PDT Commissioning and Plans (Neeti Parashar)
Scintillator Pulser for Scintillator Commissioning (Steve Doulas)
PDT Drift-Time-to-Distance (Chunhui Luo)
September 29, 2000
Forward Muon Installation Progress (Linda Stutte)
Status of L2 Test Stand (Arthur Maciel)
Muon Calibration Database (Usha Rao)
1553 GUI Setup (Xiaonan Li)
1553 Code Status (Vladimir Podstvkv)
Muon L3 Trigger Commissioning (Paul Balm)
September 15, 2000
Status of the L1 Muon Trigger (Ken Johns)
Forward Muon Installation (Henry Lubatti)
Drift-time-to-distance in MDT's (Leonid Vertogradov)
Progress Report from the Calibration Group (Andrzej Zieminski)
Progress in PReco (Daria Zieminska)
September 1, 2000
Forward Muon Installation (Linda) Verbal only.
Progress and Algorithms for Muon Level 2 (Serguei Uzunyan)
Progress in Central Muon Commissioning (Neeti Parashar) Verbal only.
August 18, 2000
MDT Production in Lab F (DenisovD)
MDT Octant Testing (Malyshev)
MDT Drift-time-to-distance (Denisov,Yatsunenko)
Forward Muon Installation progress (Lubatti)
Ideas on Muon Triggers (Bruce Hoeneisen) No slides available.
Muon Data-Taking (Jerome Sajot)
July 21, 2000
MDT Octants: Ass'y & Status - L. Vertogradov
Readout of Gas Sensors from MDT Octant - Tianchi Zhao
Forward Muon Installation Status - Linda Stutte
Central Muon Commissioning Progress - Tom D.
PDT Thresholds Test - Onne Peters
PDT Controls Program - Xiaonan Li
Muon Survey - Al Ito
Progress on Muon ID & Reco - Christophe Royon
July 7, 2000
Muon Commissioning Meetings: Dmitri
Summary of Central Muon Commissioning for week of July 3rd: Neeti Parashar
L1 Trigger Status: Ken Johns
Progress with MDT L1 trigger boards: John Butler
Tests of C Layer MDT Octants: V. Malyshev
June 20, 2000 @ NIU Workshop
Introduction - 24 hrs before beam: T. Diehl
Muon Detector Status: D. Denisov
PDT Calibration: A. Zieminski (no slide copies)
Scintillation Counter Calibration: S. Doulas
Scintillation Counter Calibration: V. Evdokimov
MDT Calibration: L. Vertogradov
Downloading, Database, Monitoring & Alarms: D. Wood
L1 trigger: K. Johns
L2 trigger: A. Maciel
L3 filters: Amber Boehnlein (no slides)
Muon Examine & Event Display: D. Hedin
Muon ID: D. Zieminska (no slide copies)
Muon Reconstruction: C. Royon
Muon Control Room Participation: T. Diehl (no slides)
Special Session on Detector Response in MC: D. Hedin, T.D.
Special Session on Hit Definition: D. Hedin (no slides)
Summary for Plenary: From Detector to Ntuple: Steve Doulas (no slide copies)
June 9, 2000
We ran an informal and agenda-less meeting aimed at commissioning.
We collected no slides.
May 26, 2000
New Installation Schedule for Forward Muon: D. Denisov
Summary of B layer MDT tubes tests: A. Kalinin
Cosmic ray commissioning of pixels octant: V. Evdokimov
Status of Lab F MDT assembly: L. Stutte
Results of 1st C layer MDT octant tests: V. Malyshev
MDT/pixels installation progress: H. Lubatti (no slides)
Aphi Commissioning Progress: Pavel Polzov
Cosmic Cap Commissioning: Al Ito (no slides)
PDT Commissioning: Tom Marshall (no slides)
PDT Control Board: Neeti Parashar (no slides)
May 12, 2000
Tests of B-Layer tubes at Lab F and A Layer Octants at D0: Dmitri (no slides)
Lab F Ass'y Progress: Linda
A-Layer MDT Installation: Henry Lubatti
Forward Muon Commissioning Status: Dmitri (no slides)
Aphi Commissioning Progress: Polozov (no slides)
Cosmic Cap Commissioning: Diehl
PDT Commissioning: Marshall
PDT Alignment: Ito
PDT Control Board Status: Sten Hansen (no slides)
MCH3 Electronics and Code Commissoning: Podstavkov and Churin
April 28, 2000
We ran an informal and agenda-less meeting aimed at commissioning.
We collected no slides.
April 12, 2000 (Collaboration Meeting)
Lab F MDT octants assembly/ A layer installation: Linda Stutte - 10min.
MDT tubes and octants tests results: Leonid Vertogradov - 10min.
Pixels octants long term tests summary: Valery Evdokimov - 10min. (no slides)
Muon electronics status: Boris Baldin - 10min.
VME/octant noise supression: Gena Alexeev - 10min.
On-line software development status: Darien Wood - 15min. (no slides)
Central muon system commissioning: Tom Diehl - 15min.
March 31, 2000
Status of MDT Octant Ass'y - Linda (no slides)
Update of Results from MDT Octant Tests (V. Malyshev)
Noise Pickup from VME Crate - Gena Alexeev
MDT A-Layer Installation - Linda (no slides)
Central Muon Scintillator Crate Readout - Vladimir Podstavkov
Central Muon Pulser Tests - Steve Doulas
WAMUS PDT L2 Trigger Accept DSP Results - Neeti Parashar
1553 Busses for Central and Forward Muon - Tom Diehl
March 17, 2000
Muon Electronics Status - Boris
PDT 247 Mounting System - Ed Lavallie
March 3, 2000
Status of MDT Octant Ass'y - Linda (no slides)
Update on Results of MDT Octant Testing - Leonid (no slides)
Results from Long Term MDT Tests - V. Malyshev
Forward Muon Installation - Henry Lubatti
B-Layer Pixel Calibration Installtion and Testing - Nick Kirsch
Scint. Calibration and Electronics Status - Steve Doulas
Muon ID: Status of Offline and L3 Algo. - Daria Zieminska
Trigger Terms Definition and Status - Freedy Nang
February 18, 2000
Status of MDT and Pixel Octant Ass'y @ Lab F - Linda
Update of Results of MDT Octant tests - Leonid (verbal)
Update of Results of Pixel tests - Valerie
Forward Muon Install - Linda
February 4, 2000
Status of MDT & Pixel Octant Ass'y @ Lab F - Linda
Update of Results of MDT Octant Testing - Leonid
Status of Pixel Detectors at Lab F - Valerie Evdokimov (verbal report)
Progress on EMC Truss and Shielding Ass't - Tom D.
Forward Muon Installation - Henry Lubatti
L3 PLans and Progress towards Commissioning Milestones - Paul Balm
January 21, 2000
Status of MDT & Pixel Octant Ass'y @ Lab F - Linda
Update of Results of MDT Octant Testing - Dmitri for Leonid
Calibration Plans for Near-to-mid-term Commissioning - Darien Wood
Progress on Central & Forward Muon Survey - Al Ito
Results of Fitting Mock Survey Data - Daria Zieminska for Judong Huang
Muon Examine - Dave Hedin
Offline Software Review Results - Pushpa Bhat
January 13, 2000
Electronics Delivery Status - Boris Baldin
Central Muon Commissioning - Tom Diehl
L1 Trigger Commissioning - Dave Fein
Forward Muon Installation Schedule - Dmitri Denisov
Status of Pixel and MDT Octant Ass'y at Lab F - Linda Stutte
Status of Pixel Detectors at Lab F - Valerie Evdokimov
January 7, 2000
SRC & SFE Testing and Readout Software - Vladimir Podstavkov
Status of MDT C-Layer Frame Procurement - Dmitri Denisov
Status of MDT & Pixel Octant Ass'y at Lab F - Linda Stutte
Results of MDT Octant Tests - Leonid Vertogradov
Status of Pixel Detectors @ Lab F - Valerie Evdokimov
December 10, 1999
Forward Muon Segment Identification and Tracking - Oleg Eroshin
Results of the first MDT octant tests - Leonid Vertogradov
Status of MDT and Pixel Octant Ass'y @ Lab F - Linda Stutte (no slides)
Status of Pixel Detectors @ Lab F - Valerie Evdokimov
Recent Progress in Central Muon LED Pulser System - Pierrick Hanlet
List of Items in All Muon Upgrade Meetings July, 1995 to April 1996
April 12, 1996
The Upgrade of the Forward Muon Detector - Dimitri
Progress Report on the Upgrade of the Central Muon Detector - Tom D.
Update on Progress in the L1 Trigger - Dave Fein
March 29, 1996
Fixed-Target Induced Collision Hall Radiation - Al Ito
Calorimeter Trigger in L2 - Joan Guida
Studies of the FEU-115M PMT - Alexander Dyshkant
March 15, 1996
Muon Data Formats for Run 2 - Boris
Muon Data Acquisition - Fortner
Level 1 Muon Trigger Progress - Ken
March 8, 1996
Comparison of Various Phototubes - Alexander Dyshkant
Hall Activation - A Real Problem - Dimitri
February 23, 1996
A-phi Detector Collision Hall Results - Joey Thompson
Collision Hall Forward Pixel Rates - Vladimir
February 9, 1996
Iarocci News - Gena Alexeev
A-phi Results - Gervasio Gomez
Electronics Update - Boris
Level 1 - Ken Johns
Progess on CFB Bottom - Naba
Cosmic cap - Al Ito
Amplitude Readout of Pixels - Dimitri
January 26, 1996
Claudio Rivetta - FNAL Physics Dept HV
Valerie - Topics in Scint. Testing
Joan Guida - Muon + Cal in Upgrade Level 2
Ajay - Octant Sharing in the muon trigger
January 5, 1996
Cosmic Bottom Counters - Tom
Progress on the CFB Bottom - Naba
A-phi and Big Pixel Prototype Counter Studies - Valerie
December 15, 1995
Progress Report on EF Iarocci Tube Trigger Studies - Rama
Effect of Pads in the A-layer - Darien
Tests on a Big Scint Counter with Fibers Around the Outside - Naba
Central Detector Progress Report - Tom
December 1, 1995
Muon Magnets in the D0 Upgrade - Dimitri
Muon Momentum Resolution in EF Region - Dimitri
Shielding Studies - Vladimir Sirotenko
Pixel Scintillator Studies - Vladimir Evdokimov
Iarocci Pad Cosmic Test - Tom Marshall
L1 Muon Trigger Status - Ken
November 17, 1995
Shielding Design - Vladimir Sirotenko
Shielding Studies - Sergei Striganov
A-Layer Rates - Dave Hedin
Scintillator Studies - Valeri Evdokimov
DSP Simulation Results - Vladimir Podstavkov
November 3, 1995
Status Report on L1.0 Trigger - KJ
Scintillator Studies - Valeri Evdokimov
Muon Level 2 - Mike Fortner
Shielding Studies - TD
October 27, 1995
Shielding Calculation Status - TD
Central Detectors - TD
Pixel Counter Tests - Valeri Evdokimov
Electronics Status - Boris Baldin, Sten Hansen
October 20, 1995
Iarocci Tube Prototype Studies - Gena
WAMUS Pad Readout Offline Studies - Darien
Status Report from U. of Arizona: Hardware and Software - KJ
L2 Architecture and Muon Level 2 - Mike F.
Long Term Plan for EF WAMUS PDTS - TD
October 6, 1995
Status Report from U. of Arizona: Hardware and Software - Ajay
Discussion of Review Committee Reply - John Butler
Status of CF Bottom B Construction - Naba
September 15, 1995
MELZ Tubes Test - A. Galyaev
Recent Results of Shielding Studies - N. Mokhov
Measurement of Space Available in CF A-Layer - H. Cease
September 8, 1995
Effect of EFA Scint Coverage on J/psi->uu Trigger Acceptance - T. Diehl
Proposal for Large Scale Cosmic Ray Telescope for Muon Upgrade - D. Denisov
Scintillator Update - A. Ito
MELZ Tubes Test - A. Galyaev
EFA Scint Cost Est Update - T.
September 1, 1995
Neutron Sensitivity of Gaseous Detectors - Dimitri Denisov
EF Pixel Scintillation Counter Update - Al Ito
August 25, 1995
Forward Muon Shielding: Sergei
Borated vs Unborated Polyethylene: Volodia
Shielding Issues: Tom
Prototype EF Pixel Counters: Al
August 4, 1995
Estimated Resolution Improvement from 9th Layer - Tom Diehl
Trigger Rate Studies with Geant and More - Ken Johns
Level 2 Trigger - Mike Fortner
Long-Time Tail Studies - Dimitri + Tom
EFA Scintillator Pictures - Al Ito
July 21, 1995
Muon Upgrade Electronics Status - Boris
Trigger Rate studies in CF - Ajay
Comments on Shielding - Nikolai
Baseline Plan - Tom D.
SAMUS Trigger Rates - Dimitri
Comments - Tom D.
Isajet Study B->;Psi Ks, Psi->mumu - Tom D.
B Physics Eta Coverage - Andrzej
Time Distribution of Background - Tom M.
List of Items in some Muon Upgrade Meetings before July, 1995
March 31, 1995
Shielding Studies For Intermediate and Forward - Nikolai Mokhov
GEANT Shielding Studies in Intermediate and Forward - Vladimir Sirotenko
February 10, 1995
February Shutdown Muon Upgrade Plans - TD, DD and AI
WAMUS Service Card - Boris and Sten
Intermediate Eta ( 1.0<|eta|<1.5 ) Trigger Rate Estimates - TD
November 11, 1994
Introduction to Upgrade Trigger Simulator + CFT Rates - Jerry Blazey
Muon TrigSim Studies - Ajay Narayanan
Mars12 Shielding Simulation Results - Tom Diehl
A-Layer and Bottom B Layer Test Counter Results - Joey Thompson
Bottom B Scintillator Prototypes - Al Ito
A-Phi Prototypes - TD for Sarah Eno
EF Pad Chambers - Tom Marshall
Front-End Electronics - Boris Baldin and Sten Hansen
Trigger Electronics - Ken Johns
SAMUS Pixel Counters - Victor Bezzubov
October 7, 1994
SAMUS Pixel Counters - Dimitri Denisov
A-Phi and Bottom B Scintillation Counters - Tom Diehl
SAMUS and WAMUS Front-End Electronics - Boris, Nikolai Bozko and Sten Hansen
April 4, 1994
WAMUS Electronics - Boris
Testing Serial DataLinks - Joel Steinberg
Timing the Trigger Electronics - Ken Johns
A-phi Counters - Tom D.