This is a list of Presentations at Muon Upgrade Meetings

Copies of Most slides are available at DAB6 (see Tom or Dmitri)


List of Items in All Muon Upgrade Meetings since December, 1999

 November 7, 2001 
 PDT Time-To-Distance Analysis (Chun-Hui Luo)
 Offline Muon Calibration Software Status (Antoine Kouchner)
 PDT Status (Markus Wobisch)
 Central Muon Scintillator Counter Commissioning and Calibration (Steve Doulas)
 Pixel Status and FAMUS Special Runs (Andrei Schukin)
 L1Muo Status (Jeff Temple)
 MDT Status (Bassar Sabirov)

 September 14, 2001
 Status of Muon Detectors (Bassar Sabirov)
 PDT Status & Plans (Diehl)
 Status and Plans for L2 (Arthur Maciel)
 Muon L1 Status & Plans (Rob McCroskey)
 Segment B+C and Scintillator Matching ()
 Performance of Local Tracking Fit in FAMUS (Daria Zieminska)
 WAMUS Data and reconstruction (Raimund Stroehmer)
 Software Release Status (Linda Stutte)
 Status of Alignment/Calibration (Jundohng Zhang)

 July 25, 2001
 Combined Detector Status Talk (Bassar Sabirov)
 PDT Drift-time-to-distance Calculation (Bernardo Gomez)
 MDT Plane Efficiency in Tracking (Yuri Yatsunenko)
 AC Layer Coincidence Studies in Minbias Events  (Sudeshna Banerjee)
 Progress in the muon segment linked-list algorithm (Onne Peters)
 Muon Tracking Status (Frederic Deliot)

 May 25, 2001 
 L1 Muon Trigger Status and Commissioning (Rob McCroskey)
 L2 Muon Trigger Status and Commissioning (Arthur Maciel)
 L3 Muon Trigger Status and Commissioning (Paul Balm)
 Triggers for Muon Detector Commissioning (Tom Diehl)

 April 25, 2001
 Calibration Overview (Darien Wood)
 Database and Browser (Jundong Huang)
 Downloading PDT's from Database (Neeti Parashar)
 Secondary Daq Status (Dennis Shpakov)
 Unpacking and Error Checking (Mike Fortner)
 Muon Tracking Plans (Dave Hedin)

 April 14, 2001
 Agenda for PDT Readiness Review (Tom Diehl)
 Gas System (John Krider)
 Cables (Tom Marshall)
 High and Low Voltage (Tom Diehl)
 Electronics (Herman Haggerty)
 Monitor and Control (Tom Diehl)
 MCH3 Readout (Tom Diehl)
 Examine (Dave Hedin)
 Survey (Al Ito)

 March 2, 2001
 LED Fiber Pulsing Calibration in the Cosmic Cap (Shashi Dugad)
 PDT Control Board Installation Progress (Tom)
 
 February 7, 2001
 Introduction (Tom) 
 Anticipated Detector Status (Dmitri)
 Muon Offline (Daria Zieminska)
 L3 CFT Tracking Tool (Ray Beuselinck)
 L1 Trigger (Ken Johns)
 L2 Trigger (Arthur Maciel)
 Muon L3 Tool (Dave Hedin)
 Calibration Database (Jundong Huang)
 Scintillator Calibration (Shashi Dugad)
 Summary (Tom)

 January 19, 2001
 Central Muon Installation Status (Tom Diehl)
 Pixels and MDT Installation (Linda Stutte) verbal
 Pixels and MDT Commissioning Status Pre-Roll-In (Dmitri)
 Control Boards (Sten Hansen and Boris Baldin) verbal

 January 5, 2001 
 Pixels and MDT Installation (Linda Stutte)
 Pixels and MDT Commissioning Status and Plans (Dmitri Denisov)
 Muon Electronics Support in Run II (Boris Baldin)
 Central Muon Scintillator Commissioning (Steve Doulas)
 Cosmic Ray Running (Jaehoon Yu)

 December 8, 2000
 Muon Level 2 Trigger Introduction  (Arthur Maciel)
 SLIC Status testing reports and plans  (Arthur for Burair)
 The physics algorithm - hardware interface  (Arthur)
 Overview and Status of Muon L2 Simulator  (Christos Leonidopoulos)
 Overview and Status of Central mu-stub finding  (Sergey Ouzonian)
 Forward stub finding progress report (A layer)  (Raimund Strohmer) 
 Forward stub finding progress report (BC layers)  (Tim Christiansen) 

 November 10, 2000
 A Layer MDT Trigger (Raimund Strohmer)
 B+C Layer MDT L2 Trigger (Tim Christiansen)
 Central Muon L2 Trigger (Sergey Ouzonian)
 Forward Muon Installation Progress (Linda)
 LED Pulser and Scintillator Readout (Steve Doulas)
 Event Display Picture (Nobu via Daria)
 Central Muon Commissioning and News (Tom Diehl)
 Magnetic Field Calculations (Vladimir Korablev)
 Progress in the Calibration Database (Andrzej Zieminski)

 October 11, 2000
 MCH3 Cable Installation (Tom Marshall)
 Forward Muon Installation Schedule (Henry Lubatti)
 L1 Trigger Update (Rob Mccrosky)
 L3 Filter Commissioning Progress and Plans (Paul Balm)
 Pixel Octant Readout and Commissioning (Igor Vasilyev)
 MDT Commissioning (Bassar Sabirov)
 PDT Commissioning and Plans (Neeti Parashar)
 Scintillator Pulser for Scintillator Commissioning (Steve Doulas)
 PDT Drift-Time-to-Distance (Chunhui Luo)

 September 29, 2000
 Forward Muon Installation Progress (Linda Stutte)
 Status of L2 Test Stand (Arthur Maciel)
 Muon Calibration Database (Usha Rao)
 1553 GUI Setup (Xiaonan Li)
 1553 Code Status (Vladimir Podstvkv)
 Muon L3 Trigger Commissioning (Paul Balm)

 September 15, 2000
 Status of the L1 Muon Trigger (Ken Johns) 
 Forward Muon Installation (Henry Lubatti)
 Drift-time-to-distance in MDT's (Leonid Vertogradov)
 Progress Report from the Calibration Group (Andrzej Zieminski)
 Progress in PReco (Daria Zieminska)

 September 1, 2000 
 Forward Muon Installation (Linda) Verbal only.
 Progress and Algorithms for Muon Level 2 (Serguei Uzunyan)
 Progress in Central Muon Commissioning (Neeti Parashar) Verbal only.

 August 18, 2000 
 MDT Production in Lab F (DenisovD) 
 MDT Octant Testing (Malyshev) 
 MDT Drift-time-to-distance (Denisov,Yatsunenko)
 Forward Muon Installation progress (Lubatti) 
 Ideas on Muon Triggers (Bruce Hoeneisen) No slides available.
 Muon Data-Taking (Jerome Sajot)

July 21, 2000
 MDT Octants: Ass'y & Status - L. Vertogradov
 Readout of Gas Sensors from MDT Octant - Tianchi Zhao
 Forward Muon Installation Status - Linda Stutte
 Central Muon Commissioning Progress - Tom D. 
 PDT Thresholds Test - Onne Peters
 PDT Controls Program - Xiaonan Li
 Muon Survey - Al Ito
 Progress on Muon ID & Reco - Christophe Royon

July 7, 2000
 Muon Commissioning Meetings: Dmitri
 Summary of Central Muon Commissioning for week of July 3rd: Neeti Parashar
 L1 Trigger Status: Ken Johns
 Progress with MDT L1 trigger boards: John Butler 
 Tests of C Layer MDT Octants: V. Malyshev

June 20, 2000 @ NIU Workshop
 Introduction - 24 hrs before beam: T. Diehl 
 Muon Detector Status: D. Denisov 
 PDT Calibration: A. Zieminski (no slide copies)
 Scintillation Counter Calibration: S. Doulas 
 Scintillation Counter Calibration: V. Evdokimov 
 MDT Calibration: L. Vertogradov 
 Downloading, Database, Monitoring & Alarms: D. Wood 
 L1 trigger: K. Johns 
 L2 trigger: A. Maciel 
 L3 filters: Amber Boehnlein (no slides)
 Muon Examine & Event Display: D. Hedin  
 Muon ID: D. Zieminska (no slide copies)
 Muon Reconstruction: C. Royon
 Muon Control Room Participation: T. Diehl (no slides)
 Special Session on Detector Response in MC: D. Hedin, T.D. 
 Special Session on Hit Definition: D. Hedin (no slides)
 Summary for Plenary: From Detector to Ntuple: Steve Doulas (no slide copies)

June 9, 2000
 We ran an informal and agenda-less meeting aimed at commissioning. 
 We collected no slides.

May 26, 2000 
 New Installation Schedule for Forward Muon: D. Denisov
 Summary of B layer MDT tubes tests: A. Kalinin 
 Cosmic ray commissioning of pixels octant: V. Evdokimov 
 Status of Lab F MDT assembly: L. Stutte 
 Results of 1st C layer MDT octant tests: V. Malyshev 
 MDT/pixels installation progress: H. Lubatti (no slides)
 Aphi Commissioning Progress: Pavel Polzov 
 Cosmic Cap Commissioning: Al Ito (no slides)
 PDT Commissioning: Tom Marshall (no slides)
 PDT Control Board: Neeti Parashar (no slides)

May 12, 2000
 Tests of B-Layer tubes at Lab F and A Layer Octants at D0: Dmitri (no slides)
 Lab F Ass'y Progress: Linda
 A-Layer MDT Installation: Henry Lubatti
 Forward Muon Commissioning Status: Dmitri (no slides)
 Aphi Commissioning Progress: Polozov (no slides)
 Cosmic Cap Commissioning: Diehl 
 PDT Commissioning: Marshall
 PDT Alignment: Ito 
 PDT Control Board Status: Sten Hansen (no slides)
 MCH3 Electronics and Code Commissoning: Podstavkov and Churin
 
April 28, 2000
 We ran an informal and agenda-less meeting aimed at commissioning. 
 We collected no slides.

April 12, 2000 (Collaboration Meeting)
 Lab F MDT octants assembly/ A layer installation: Linda Stutte - 10min.
 MDT tubes and octants tests results: Leonid Vertogradov - 10min.
 Pixels octants long term tests summary: Valery Evdokimov - 10min. (no slides)
 Muon electronics status: Boris Baldin - 10min.
 VME/octant noise supression: Gena Alexeev - 10min.
 On-line software development status: Darien Wood - 15min. (no slides)
 Central muon system commissioning: Tom Diehl - 15min.

March 31, 2000
 Status of MDT Octant Ass'y - Linda (no slides)
 Update of Results from MDT Octant Tests (V. Malyshev)
 Noise Pickup from VME Crate - Gena Alexeev
 MDT A-Layer Installation - Linda (no slides)
 Central Muon Scintillator Crate Readout - Vladimir Podstavkov
 Central Muon Pulser Tests - Steve Doulas
 WAMUS PDT L2 Trigger Accept DSP Results - Neeti Parashar
 1553 Busses for Central and Forward Muon - Tom Diehl

March 17, 2000
 Muon Electronics Status - Boris
 PDT 247 Mounting System - Ed Lavallie

March 3, 2000
 Status of MDT Octant Ass'y - Linda (no slides)
 Update on Results of MDT Octant Testing - Leonid (no slides)
 Results from Long Term MDT Tests - V. Malyshev 
 Forward Muon Installation - Henry Lubatti
 B-Layer Pixel Calibration Installtion and Testing - Nick Kirsch
 Scint. Calibration and Electronics Status - Steve Doulas
 Muon ID: Status of Offline and L3 Algo. - Daria Zieminska
 Trigger Terms Definition and Status - Freedy Nang

February 18, 2000
 Status of MDT and Pixel Octant Ass'y @ Lab F - Linda
 Update of Results of MDT Octant tests - Leonid (verbal) 
 Update of Results of Pixel tests - Valerie
 Forward Muon Install - Linda

February 4, 2000
 Status of MDT & Pixel Octant Ass'y @ Lab F - Linda
 Update of Results of MDT Octant Testing - Leonid
 Status of Pixel Detectors at Lab F - Valerie Evdokimov (verbal report)
 Progress on EMC Truss and Shielding Ass't - Tom D.
 Forward Muon Installation - Henry Lubatti
 L3 PLans and Progress towards Commissioning Milestones - Paul Balm

January 21, 2000
 Status of MDT & Pixel Octant Ass'y @ Lab F - Linda
 Update of Results of MDT Octant Testing - Dmitri for Leonid
 Calibration Plans for Near-to-mid-term Commissioning - Darien Wood
 Progress on Central & Forward Muon Survey - Al Ito
 Results of Fitting Mock Survey Data - Daria Zieminska for Judong Huang
 Muon Examine - Dave Hedin
 Offline Software Review Results - Pushpa Bhat

January 13, 2000
 Electronics Delivery Status - Boris Baldin
 Central Muon Commissioning - Tom Diehl
 L1 Trigger Commissioning - Dave Fein
 Forward Muon Installation Schedule - Dmitri Denisov
 Status of Pixel and MDT Octant Ass'y at Lab F - Linda Stutte
 Status of Pixel Detectors at Lab F - Valerie Evdokimov

January 7, 2000
 SRC & SFE Testing and Readout Software - Vladimir Podstavkov
 Status of MDT C-Layer Frame Procurement - Dmitri Denisov
 Status of MDT & Pixel Octant Ass'y at Lab F - Linda Stutte
 Results of MDT Octant Tests - Leonid Vertogradov
 Status of Pixel Detectors @ Lab F - Valerie Evdokimov

December 10, 1999
 Forward Muon Segment Identification and Tracking - Oleg Eroshin 
 Results of the first MDT octant tests - Leonid Vertogradov 
 Status of MDT and Pixel Octant Ass'y @ Lab F - Linda Stutte (no slides)
 Status of Pixel Detectors @ Lab F - Valerie Evdokimov 
 Recent Progress in Central Muon LED Pulser System - Pierrick Hanlet 

List of Items in All Muon Upgrade Meetings July, 1995 to April 1996


April 12, 1996
 The Upgrade of the Forward Muon Detector - Dimitri
 Progress Report on the Upgrade of the Central Muon Detector - Tom D.
 Update on Progress in the L1 Trigger - Dave Fein

March 29, 1996
 Fixed-Target Induced Collision Hall Radiation - Al Ito
 Calorimeter Trigger in L2 - Joan Guida 
 Studies of the FEU-115M PMT - Alexander Dyshkant

March 15, 1996
 Muon Data Formats for Run 2 - Boris
 Muon Data Acquisition - Fortner
 Level 1 Muon Trigger Progress - Ken

March 8, 1996
 Comparison of Various Phototubes - Alexander Dyshkant
 Hall Activation - A Real Problem - Dimitri
 
February 23, 1996
 A-phi Detector Collision Hall Results - Joey Thompson
 Collision Hall Forward Pixel Rates - Vladimir

February 9, 1996
 Iarocci News - Gena Alexeev
 A-phi Results - Gervasio Gomez
 Electronics Update - Boris
 Level 1 - Ken Johns
 Progess on CFB Bottom - Naba
 Cosmic cap - Al Ito
 Amplitude Readout of Pixels - Dimitri
 
January 26, 1996
 Claudio Rivetta - FNAL Physics Dept HV
 Valerie - Topics in Scint. Testing
 Joan Guida - Muon + Cal in Upgrade Level 2 
 Ajay - Octant Sharing in the muon trigger

January 5, 1996
 Cosmic Bottom Counters - Tom
 Progress on the CFB Bottom - Naba
 A-phi and Big Pixel Prototype Counter Studies - Valerie 

December 15, 1995
 Progress Report on EF Iarocci Tube Trigger Studies - Rama
 Effect of Pads in the A-layer - Darien
 Tests on a Big Scint Counter with Fibers Around the Outside - Naba
 Central Detector Progress Report - Tom 

December 1, 1995
 Muon Magnets in the D0 Upgrade - Dimitri
 Muon Momentum Resolution in EF Region - Dimitri
 Shielding Studies - Vladimir Sirotenko
 Pixel Scintillator Studies - Vladimir Evdokimov
 Iarocci Pad Cosmic Test - Tom Marshall
 L1 Muon Trigger Status - Ken 

November 17, 1995
 Shielding Design - Vladimir Sirotenko
 Shielding Studies - Sergei Striganov
 A-Layer Rates - Dave Hedin
 Scintillator Studies - Valeri Evdokimov
 DSP Simulation Results - Vladimir Podstavkov

November 3, 1995
 Status Report on L1.0 Trigger - KJ
 Scintillator Studies - Valeri Evdokimov
 Muon Level 2  -  Mike Fortner
 Shielding Studies - TD

October 27, 1995
 Shielding Calculation Status - TD
 Central Detectors - TD
 Pixel Counter Tests - Valeri Evdokimov 
 Electronics Status - Boris Baldin, Sten Hansen

October 20, 1995
 Iarocci Tube Prototype Studies - Gena
 WAMUS Pad Readout Offline Studies - Darien 
 Status Report from U. of Arizona: Hardware and Software - KJ
 L2 Architecture and Muon Level 2 - Mike F.
 Long Term Plan for EF WAMUS PDTS - TD
 
October 6, 1995
 Status Report from U. of Arizona: Hardware and Software - Ajay
 Discussion of Review Committee Reply - John Butler
 Status of CF Bottom B Construction - Naba

September 15, 1995
 MELZ Tubes Test - A. Galyaev
 Recent Results of Shielding Studies - N. Mokhov
 Measurement of Space Available in CF A-Layer - H. Cease

September 8, 1995
 Effect of EFA Scint Coverage on J/psi->uu Trigger Acceptance - T. Diehl
 Proposal for Large Scale Cosmic Ray Telescope for Muon Upgrade  - D. Denisov
 Scintillator Update - A. Ito
 MELZ Tubes Test - A. Galyaev
 EFA Scint Cost Est Update - T. 

September 1, 1995
 Neutron Sensitivity of Gaseous Detectors - Dimitri Denisov
 EF Pixel Scintillation Counter Update - Al Ito

August 25, 1995 
 Forward Muon Shielding: Sergei   
 Borated vs Unborated Polyethylene: Volodia   
 Shielding Issues: Tom   
 Prototype EF Pixel Counters: Al 

August 4, 1995
 Estimated Resolution Improvement from 9th Layer - Tom Diehl
 Trigger Rate Studies with Geant and More - Ken Johns
 Level 2 Trigger - Mike Fortner
 Long-Time Tail Studies - Dimitri + Tom
 EFA Scintillator Pictures - Al Ito

July 21, 1995
 Muon Upgrade Electronics Status - Boris
 Trigger Rate studies in CF - Ajay
 Comments on Shielding - Nikolai
 Baseline Plan - Tom D.
 SAMUS Trigger Rates - Dimitri 
 Comments - Tom D.
 Isajet Study B->;Psi Ks, Psi->mumu - Tom D.
 B Physics Eta Coverage - Andrzej
 Time Distribution of Background - Tom M.

List of Items in some Muon Upgrade Meetings before July, 1995

March 31, 1995
 Shielding Studies For Intermediate and Forward - Nikolai Mokhov
 GEANT Shielding Studies in Intermediate and Forward - Vladimir Sirotenko

February 10, 1995
 February Shutdown Muon Upgrade Plans - TD, DD and AI
 WAMUS Service Card - Boris and Sten
 Intermediate Eta ( 1.0<|eta|<1.5 ) Trigger Rate Estimates - TD

November 11, 1994
 Introduction to Upgrade Trigger Simulator + CFT Rates - Jerry Blazey 
 Muon TrigSim Studies - Ajay Narayanan
 Mars12 Shielding Simulation Results - Tom Diehl
 A-Layer and Bottom B Layer Test Counter Results - Joey Thompson
 Bottom B Scintillator Prototypes - Al Ito
 A-Phi Prototypes - TD for Sarah Eno
 EF Pad Chambers - Tom Marshall
 Front-End Electronics - Boris Baldin and Sten Hansen
 Trigger Electronics - Ken Johns
 SAMUS Pixel Counters - Victor Bezzubov

October 7, 1994 
 SAMUS Pixel Counters - Dimitri Denisov
 A-Phi and Bottom B Scintillation Counters - Tom Diehl
 SAMUS and WAMUS Front-End Electronics - Boris, Nikolai Bozko and Sten Hansen
 
April 4, 1994
 WAMUS Electronics - Boris 
 Testing Serial DataLinks - Joel Steinberg
 Timing the Trigger Electronics - Ken Johns
 A-phi Counters - Tom D.