The Run Plan can be found at http://www-d0.fnal.gov/runcoor/runplans/runplan.html
The Run Plan Standard Instructions can be found at
http://www-d0.fnal.gov/runcoor/runplans/runplan_standard.html
This run plan covers:
Detector, online and trigger groups need to
send needs and requests for special running conditions and work to d0runrequests@fnal.gov
Requests for access should be sent to
d0accessrequests@fnal.gov.
Priorities for the current Store
Priorities when NOT in Store
Status and Plans
Store 700 is colliding and will be kept until at least Sunday.
The Pbar stack will be used for Recycler shots on Saturday. Depending on
the Tevatron luminosity and the Pbar stack, another shot may occur on Sunday.
The default trigger configuration file for collisions was updated Sep 14 to
global_CalMuon-1.1.xml. This trigger configuration emphasizes muon,
jet and EM triggers and includes di-muon and
di-em triggers. There are L3 filters for the 2 lower ET jet and EM trigger.
Note the
special instructions in the trigger file and prescale file about setting
prescales for the L3 triggers. For global data taking during curfew
(21:00-09:00), use 8 L3 nodes, for other times use 6 L3 nodes.
DAQ Shifters should set prescales to maintain the desired data
rates as specified in the trigger files. The desired rate should be kept to
about 20 Hz to 12 Hz out of L3. If the rate falls below 12 Hz, the run
should be stopped and prescales set to increase the rate.
Captains should check to
make sure the rates make sense and are within the desired ranges.
Contact the Triggermeisters or the Commissioning Coordinators if there
are problems.
For no colliding beam these are the trigger files:
Shift Captains must make a SAM dataset for good runs at the END OF EVERY
SHIFT. Use the SAM dataset web page (see the Standing Instructions for details).
Note to Captains: The Operations Technicians are taking care of the
safety walk through represented on the 3rd page of the Captain's checklist.
Captains are still responsible for safety walkthroughs on the first two pages
including the 2nd floor of the Fixed Counting House. Heidi Schellman has
put together a very useful
Pictorial Guide
to components in the Control Room
and in DAB.
SMT will be out of the run until their HV modules are replaced.
The Captain should include these runs in the
shift-dataset for processing by the RECO farm and send mail to
d0-farms@fnal.gov to let them know that the shift set should be processed
with high priority to determine if the triggers are performing correctly.
Shifters should take note of the following for each trigger:
Trig Name Fired rate AND/OR rate Prescale
Cosmics cosmics-1.0.xml Zero-bias zero_bias_only-1.3.xml Proton store proton_halo_only-1.2.xml Anti-proton store pbar_halo_only-1.2.xml