DØ Current Daily Run Plan

The Run Plan can be found at http://www-d0.fnal.gov/runcoor/runplans/runplan.html

The Run Plan Standard Instructions can be found at
http://www-d0.fnal.gov/runcoor/runplans/runplan_standard.html

This run plan covers:

From : EVE shift Dec 10, 2001
Through: EVE shift Dec 12, 2001
Magnet configuration (check magnet orientation instructions in the Standard Plan) :
Toroid: On Reverse
Solenoid: On Forward

Current Situation and Plans

Store 818 is colliding and will be dumped around 8:00 Tuesday morning. There will be Tevatron studies until Thursday Owl shift at which time we expect shot setup. There will be stores the remainder of the week.

There will be a Controlled Access Wednesday from 10:00-14:00. Write your access requests on the white board in the control room.

The new global trigger file is the default: global_CalMuon-2.1.xml which has corrections for the jet and EM thresholds for the L3 trigger. There are prescale files for 2, 3, 5.4 and 6E30.

The main task of the shift crew is to collect data in stable runs. Maximum input rate into Level 3 will be dictated by stable running; the Trigger Meisters will help determine this at the beginning of stores. By default, all crates should be included in global runs unless experts have removed them. Experts should be contacted if there are problems with any of the readout crates.

The FPD is planning end of store studies - these need to be coordinated with the MCR and CDF. In particular, CDF would like to be informed about which pots are being moved.

The major shift tasks are:

Any work that will be disruptive to data taking during colliding beam (e.g. DAQ system tests, L3 tests, TFW work, sDAQ etc.) must be approved by the Run Coordinator.

All work in the MCH must be done with the full knowledge and presence of the experts and can only occur during times when there is no colliding beam. No cables, configurations, crates etc should be changed without the experts explicit approval. Also the shift captain and DAQ shifter must be kept informed of any activity in the MCH and this work needs to be recorded in the electronic logbook, with the names of the people involved.

For colliding beam, the default file is now:

global_CalMuon-2.1.xml
with the appropriate prescale files (currently 2, 3, 5.4 and 6E30). See the Trigger Meister comments in the trigger file for setting prescales.

For cosmic ray running there are two files:

cosmics-1.1.xml - does not include the L2 crates
cosmics-1.2.xml - contains the L2 crates in non-readout mode
For proton-only beam running:
proton_halo_only-1.2.xml

Planned Special Runs or Activities

No special run requests at the moment.