Other Links
Archives
D0 Run II Operations
D0 at Work
Shift Captain
DAQ Shifters
Run Database
Luminosity Reports
daqAI
DZero ACNET
D0 Restricted
Physics Runs
Special Runs
Run II Bests
Run II Stores
Data Taking Downtime
Current Events
MCR & CDF
Accelerator Schedule
Beam Status (Ch 13)
MCR E-log
CDF E-log
|
|
|
(from Tuesday 08:00 April 8)
Solenoid = Reverse
Toroid = Reverse
(from Tuesday 08:00 April 15)
Solenoid = Reverse
Toroid = Forward
(from Tuesday 08:00 April 22)
Solenoid = Forward
Toroid = Forward
(from Tuesday 08:00 April 29)
Solenoid = Forward
Toroid = Reverse
For more details click on
Magnet Operations
|
global_CMT-11.03.xml
- Rules for Changing Prescales
- choose the prescale set which has a name
closest to the Luminosity at the start of the run.
- Available prescale sets for the above trigger are:
05E30, 10E30, 15E30,
20E30, 25E30, 30E30, 35E30, 40E30, 45E30, 50E30 and 60E30.
If help is needed with additional prescales, contact
the Triggermeisters.
- In this configuration, we see L1/L2/L3 rates of 500-1100/250-600/30-60 Hz,
which is primarily a function of the instantaneous luminosity.
If the rates are too high - L1>1200 or L2>700 - contact the Triggermeister.
A good effort should be made to keep the average global FEB rate below 5%.
|
-
D0 Shift Calendar
-
All Captain and DAQ shifts are 24/7.
-
Shifters can be on-call:
- if there is no Store,
- if MCR states there is no shot setup expected for 4 or more hours,
- if the situation with the sub-detector is stable,
- if there are no sub-detector tasks to perform (checklist, calibration,
special runs, monitoring), and
- if the Shift Captain is in agreement
- Calorimeter and Muon Shifters do not need confirmation from their
sub-detector coordinators. However,
there are
Special Instructions which Muon Shifters must follow before leaving.
- For the SMT & CFT/PS/FPS sub-detectors, the Shift Captain will need approval
from their sub-detector coordinators (Eric/Breese or Fred respectively) before
releasing the shifters:
- Shifters must report in with the Shift Captain to give a contact number before leaving.
|
- 4 hours
or
- Inst. Rate
in Taker < 25 Hz
|
- Main Global Monitoring page.
- Global Monitoring (GM) is being coordinated by
Pushpa Bhat, Michiel Sanders and Joe Steele.
The GM console, d0ol33, is reserved for the GM shifter during
scheduled shifts when there is beam.
Useful information, numbers and plots should be inserted into the
electronic logbook under the GM tab.
-
The name of an institution will be listed
next to the GM shifter when the Global Monitoring shift is being run remotely.
There is a GM Web Communicator GUI to be used by the Shift Captain,
remote GM Shifter, and other shifters as needed. The interface is
very simple; shifters communicate via typed text. The gui should be
open by default on the Captain console. If not, the gui can be launched with
the following command sequence: setup d0online; start_daq gmwebcom.
-
Online Data Monitoring - Current status of Online Monitoring and
Examine instructions.
-
The Shift Captain should continue to run the vertex examine (currently
on d0ol27). Michiel Sanders has documented the Vertex Examine Instructions
in PDF
and HTML.
For reference, look at the VE plots entered in the logbook during previous shifts.
|
- During non-colliding beam, the
zero_bias_3L1L2L3_1out-1.00.xml trigger
should be run with all available crates to exercise the DAQ as long
as this does not conflict with commissioning or calibration efforts.
By default, 'Recording' should be ON as we would like to monitor
the full data path from the detectors to tape at the Feynman Computing Center.
There are three trigger bits with prescales which have been tuned both to exercise
the L1, L2 and L3 rates and to send an average of 1 Hz to tape. The prescales should
only be changed by or with approval of the triggermeisters.
|
|