Run Plan
  From:  EVE Mon Nov 24, 2003
  To:    DAY Mon Dec  1, 2003

  Special Notes: none

Please send comments to the DØ Run Coordinator   
Last modified: Mon Nov 24 17:47:35 CST 2003

Links:
D0 Operations
D0 at Work
Shift Captain
DAQ Shifters
Archives
Run Database
Rates for Current Store
Luminosity Reports
Run II Bests
daqAI
DZero ACNET
Photos

D0 Restricted:
Stores and Runs
Downtime & Deadtime

MCR & CDF:
Accelerator Schedule
Beam Status (Ch 13)
MCR E-log
CDF E-log

Plots:
D0 Integrated Luminosity
D0 Efficiency (monthly)
D0 Efficiency (daily)
D0 Monthly Summary
D0 Fiscal Year
D0 vs CDF Integrated Lumi
D0 vs CDF Eff.
Control Room Procedures Index
BLS Power Supplies
Calorimeter for Non-CAL Shifters
CFT Operations
CFT Shifter On-Call
Changing Prescales
Controlled Accesses
Combined Test Stand Operations
Disable/Enable Muon Front-End
FPD Operations
FPD Procedures for Non-Experts
GM Instructions for Non-Experts
D0 High Voltage
L1CTT Inputs to L1 Muon
L1 Muon Trigger
Luminosity
Magnet Operations
Muon Shifter On-Call
Power Outage Recovery
Resetting Trips Due to Water Drip Detection
SCL Inits
SMT Voltage
STT Operations
TLD Badges
Training

Current Situation and Plans

  • The Summer/Fall shutdown that has begun on Monday, September 8, is officially over. The collision hall is interlocked, controlled access only.
  • The MCR schedule foresees stack and store for the week, with commissioning activities in between.
  • Detector commissioning is ongoing. Between stores, zero-bias and when possible cosmic ray data taking with as much of the detector as possible.
  • A request for more special runs (recorded zero bias runs to measure defects in the normalization scalers) by the luminosity group should be completed during idle time (typically evenings / owl without store). DAQ shifters have instructions, for questions please contact Tim Andeen (tandeen@northwestern.edu).

    Read the D0 Logbook before your shift in order to be better prepared!

Magnet Polarities

from Tuesday November 18, 8:00:

   Solenoid = Reverse
   Toroid   = Reverse

from Tuesday November 25, 8:00:

   Solenoid = Reverse
   Toroid   = Forward

from Tuesday December 2, 8:00:

   Solenoid = Forward
   Toroid   = Forward

See also Magnet Operations

Trigger Configuration

The default global trigger list is global_CMT-12.32.xml

Rules for Changing Prescales: choose the prescale set which has a name closest to the luminosity at the start of the run.

Available prescale sets for the above trigger are:

   02E30, 05E30, 08E30, 10E30, 13E30, 17E30, 20E30, 25E30,
   30E30, 35E30, 40E30, 45E30, 50E30, 60E30, 70E30, 80E30, and scraping.
If help is needed with additional prescales, contact the Triggermeisters.

In this configuration, we see L1/L2/L3 accept rates of 600-1500/300-800/30-60 Hz, depending on the instantaneous luminosity and prescale set. If the rates are too high - L1>1500 or L2>850 or L3>65 Hz - or the global FEB exceeds 10%: contact the Triggermeister. A good effort should be made to keep the average global FEB rate below 6%.

Recorded Physics Run Limit:    4 hours     or    instantaneous rate in Taker < 25 Hz

The DØ Shift Schedule (D0 Shift Calendar)

All Captain, DAQ and SMT shifts are 24/7.

Other shifters can be on-call:

  1. if there is no Store,
  2. if MCR states there is no shot setup expected for 4 or more hours,
  3. if the situation with the sub-detector is stable,
  4. if there are no sub-detector tasks to perform (checklist, calibration, special runs, monitoring), and
  5. if the Shift Captain is in agreement

Calorimeter, Muon and CFT Shifters do not need confirmation from their sub-detector coordinators. However, there are Special Instructions for Muon Shifters and Special Instructions for CFT/CPS/FPS Shifters which must be followed before leaving.

Shifters must report in with the Shift Captain to give a contact number before leaving.

Global Monitoring: Trigger & Physics Examines

Global Monitoring (GM) is being coordinated by Pushpa Bhat, Michiel Sanders and Joe Steele. The GM console, d0ol33, is reserved for the GM shifter during scheduled shifts when there is beam. Useful information, numbers and plots should be inserted into the electronic logbook under the GM tab.

The name of an institution will be listed next to the GM shifter when the Global Monitoring shift is being run remotely. There is a GM Web Communicator GUI to be used by the Shift Captain, remote GM Shifter, and other shifters as needed. The interface is very simple; shifters communicate via typed text. The gui should be open by default on the Captain console. If not, the gui can be launched with the following command sequence: setup d0online; start_daq gmwebcom.

Online Data Monitoring - Current status of Online Monitoring and Examine instructions.

The Shift Captain is running the vertex examine (currently on d0ol27). Michiel Sanders has documented the Vertex Examine Instructions (pdf and html). For reference, look at the VE plots entered in the logbook during previous shifts.

Periods Without a Shot Setup or Colliding Beams

During non-colliding beam, the  zero_bias_4L1L2L3MP-1.00.xml  trigger should be run with all available crates to exercise the DAQ as long as this does not conflict with commissioning or calibration efforts.

By default, 'Recording' should be ON as we would like to monitor the full data path from the detectors to tape at the Feynman Computing Center.

There are three trigger bits with prescales which have been tuned both to exercise the L1, L2 and L3 rates and to send an average of 1 Hz to tape, and a low rate L3 mark and pass trigger that writes to the monitor stream. The prescales should only be changed by or with approval of the triggermeisters.

If there is a request for cosmic ray data: the default cosmics trigger list is official/special/cosmics-3.00.xml. If the CTT is available, official/special/cosmics_trk-1.00.xml can also be used.