Run Plan
  From:  Day Tue Dec 23, 2003
  To:    EVE Tue Dec 30, 2003

  Special Notes:

  • STT Operations During Holiday Period  (22-Dec-2003)
  • Alan Stone is Acting Deputy Run Coordinator from 19 - 30 Dec 2003  (LDP 630-218-3675)
  • The Luminosity on-call pager from Dec 20 - Jan 3 is 516-359-2107.
  • Please send comments to the DØ Run Coordinator   
    Last modified: Tue Dec 23 04:37:25 CST 2003
    Links:
    D0 Operations
    D0 at Work
    Shift Captain
    DAQ Shifters
    Archives
    Run Database
    Rates for Current Store
    Luminosity Reports
    Run II Bests
    daqAI
    DZero ACNET
    Photos

    D0 Restricted:
    Stores and Runs
    Downtime & Deadtime

    MCR & CDF:
    Accelerator Schedule
    Beam Status (Ch 13)
    MCR E-log
    CDF E-log

    Plots:
    D0 Integrated Luminosity
    D0 Efficiency (monthly)
    D0 Efficiency (daily)
    D0 Monthly Summary
    D0 Fiscal Year
    D0 vs CDF Integrated Lumi
    D0 vs CDF Eff.
    Control Room Procedures Index
    BLS Power Supplies
    Calorimeter for Non-CAL Shifters
    CFT Operations
    CFT Shifter On-Call
    Changing Prescales
    Controlled Accesses
    Combined Test Stand Operations
    Disable/Enable Muon Front-End
    FPD Operations
    FPD Procedures for Non-Experts
    GM Instructions for Non-Experts
    D0 High Voltage
    L1CTT Inputs to L1 Muon
    L1 Muon Trigger
    Luminosity
    Magnet Operations
    Muon Shifter On-Call
    Power Outage Recovery
    Resetting Trips Due to Water Drip Detection
    SCL Inits
    SMT Voltage
    STT Operations
    TLD Badges
    Training

    Current Situation and Plans

    • The A0 kicker power outage at 6:15 Sat Dec 20 caused a multi-house quench and introduced a large helium leak into the cryostat vacuum near the low beta house B1. The warm-up, repairs and subsequent cool-down is estimated to take 10 days. The Tevatron is expected to be ready for beam on Tue Dec 30

    • Modified shift schedule for the duration through owl shift Tue Dec 30:
      • DAQ and operations shifts will be 24/7.
      • Captain & Detector Shifts:
        • Eve and Owl cancelled.
        • Day Shifts during weekends and holidays cancelled (Dec 21,24,25,27,28).
        • Day Shifts during working days are ON:
          • Complete checklists, assist experts, check system operations.
          • Captains should check training and handle SA keys.
      • GM Shifts cancelled.
      • Subsystem experts on-call 24/7
        • Make sure the DAQ Shifter has current contact info.
    • Normal 24/7 shift schedule resumes with the Day shift Tue Dec 30.

    • The D0 collision hall is in Supervised Access. Only the Shift Captain or Ops Shifter are authorized to distribute SA keys. Please remember to return your SA key if you leave the D0 premises - either for lunch or for home and particularly for the holidays.

    • The detector irons will be opened Mon Dec 22 morning to allow access to the east and west cathedral for work on the ICD LV fanout box and to replace a Calorimeter preamp power supply. We plan on staying open until Fri Dec 26.

    • The Shift Captain should follow the MCR e-log and call MCR as needed to keep up with dynamic schedule of the Tevatron. MCR may give D0 quiet time or a Controlled Access. Page Dmitri Denisov for Controlled Access approval. See the whiteboard for Controlled Access requests.
    • Read the D0 Logbook before your shift in order to be better prepared!

    Magnet Polarities

    from Tuesday December 23, 8:00:

       Solenoid = Forward
       Toroid   = Reverse

    from Tuesday December 30, 8:00:

       Solenoid = Forward
       Toroid   = Forward

    See also Magnet Operations

    Trigger Configuration

    The default global trigger list is global_CMT-12.32.xml

    Rules for Changing Prescales: choose the prescale set which has a name closest to the luminosity at the start of the run.

    Available prescale sets for the above trigger are:

       02E30, 05E30, 08E30, 10E30, 13E30, 17E30, 20E30, 25E30,
       30E30, 35E30, 40E30, 45E30, 50E30, 60E30, 70E30, 80E30, and scraping.
    If help is needed with additional prescales, contact the Triggermeisters.

    In this configuration, we see typical L1/L2/L3 accept rates of 600-1400/300-800/30-60 Hz, depending on the instantaneous luminosity and prescale set. If the rates are too high - L1>1500 or L2>850 or L3>65 Hz - or the global FEB exceeds 10%: contact the Triggermeister. A good effort should be made to keep the average global FEB rate below 6%.

    Recorded Physics Run Limit:    4 hours     or    instantaneous rate in Taker < 25 Hz

    The DØ Shift Schedule (D0 Shift Calendar)

    All Captain, DAQ and SMT shifts are 24/7.

    Other shifters can be on-call:

    1. if there is no Store,
    2. if MCR states there is no shot setup expected for 4 or more hours,
    3. if the situation with the sub-detector is stable,
    4. if there are no sub-detector tasks to perform (checklist, calibration, special runs, monitoring), and
    5. if the Shift Captain is in agreement

    Calorimeter, Muon and CFT Shifters do not need confirmation from their sub-detector coordinators. However, there are Special Instructions for Muon Shifters and Special Instructions for CFT/CPS/FPS Shifters which must be followed before leaving.

    Shifters must report in with the Shift Captain to give a contact number before leaving.

    Global Monitoring: Trigger & Physics Examines

    Global Monitoring (GM) is being coordinated by Michiel Sanders and Elliot Cheu. The GM console, d0ol33, is reserved for the GM shifter during scheduled shifts when there is beam. Useful information, numbers and plots should be inserted into the electronic logbook under the GM tab.

    The name of an institution will be listed next to the GM shifter when the Global Monitoring shift is being run remotely. There is a GM Web Communicator GUI to be used by the Shift Captain, remote GM Shifter, and other shifters as needed. The interface is very simple; shifters communicate via typed text. The gui should be open by default on the Captain console. If not, the gui can be launched with the following command sequence: setup d0online; start_daq gmwebcom.

    The Shift Captain is running the vertex examine (currently on d0ol27). Michiel Sanders has documented the Vertex Examine Instructions (pdf and html). For reference, look at the VE plots entered in the logbook during previous shifts.

    Periods Without a Shot Setup or Colliding Beams

    During non-colliding beam, the  zero_bias_4L1L2L3MP-1.00.xml  trigger should be run with all available crates to exercise the DAQ as long as this does not conflict with commissioning or calibration efforts.

    By default, 'Recording' should be ON as we would like to monitor the full data path from the detectors to tape at the Feynman Computing Center.

    There are three trigger bits with prescales which have been tuned both to exercise the L1, L2 and L3 rates and to send an average of 1 Hz to tape, and a low rate L3 mark and pass trigger that writes to the monitor stream. The prescales should only be changed by or with approval of the triggermeisters.

    If there is a request for cosmic ray data: the default cosmics trigger list is official/special/cosmics-3.00.xml. If the CTT is available, official/special/cosmics_trk-1.00.xml can also be used.