Links:
D0 Operations
D0 at Work
Shift Captain
DAQ Shifters
Archives
Run Database
Rates for Current Store
Luminosity Reports
Run II Bests
daqAI
DZero ACNET
Photos
D0 Restricted:
Stores and Runs
Downtime & Deadtime
MCR & CDF:
Accelerator Schedule
Beam Status (Ch 13)
MCR E-log
CDF E-log
Plots:
D0 Integrated Luminosity
D0 Efficiency (monthly)
D0 Efficiency (daily)
D0 Monthly Summary
D0 Fiscal Year
D0 vs CDF Integrated Lumi
D0 vs CDF Eff.
|
- The MCR schedule foresees stack and store.
We are collecting quality data with the full detector in
readout. Commissioning activities should occur between stores, unless
approved by the run coordinator.
Between stores, collect zero-bias data with as much of the detector
as possible.
- Use the 50E30 prescale set for begin-of-run luminosities between
42E30 and 52.5E30.
Presently we are
experiencing severe DAQ instabilities (PDT readout crashes, muon L1 crate
going out-of-sync) if the Level 2 accept rate exceeds approximately 850Hz.
The 45E30 prescale set violates this limit.
Therefore, until further notice, the above guideline is in effect.
- One special run request for tracker alignment is pending, but for the
time being it should only be taken in the case of detector problems preventing
quality data from being taken. See the special runs folder for the details.
- STT crates
The STT is in the commissioning stage, and is not used
for physics yet. From time to time these crates cause downtime for the
experiment and our procedure is the following:
- If there is no STT shifter: if SCL init does not fix STT crate
end run immediately, remove ALL STT crates from the run, continue data
taking. Addition of STT crates to data taking should only be done between
stores.
- If there is an STT shifter in the control room: provide
5-10 minutes for STT shifter to try to resolve problem with STT crate. If
unsuccessful, end the run, remove affected STT crate, start another run. If you
have to spend more than ~10-15 minutes per 8 hours shift resolving STT
crates problems, remove ALL STT crates from data taking. As above, addition
of STT crates to data taking should be done between stores only.
- The Vertex Examine phi distribution for L3 tracks is not flat. This is due
to the examine still using "old" code and been affected by ~1.4% of
non-working VLPC's. The Vertex Examine does not use L3 tracks, but
calculates "L3 track parameters" by itself. The issue will
be resolved as soon as Michiel Sanders is back in a few days.
- The Shift Captain should follow the MCR e-log and call MCR as needed
to keep up with dynamic schedule of the Tevatron. MCR
may give D0 quiet time or a Controlled Access. Page Dmitri Denisov for
Controlled Access approval. See the whiteboard for Controlled Access requests.
- Please read the
D0 Logbook before your shift in order to be better prepared.
|
from Tuesday January 6, 8:00:
Solenoid = Reverse
Toroid = Forward
from Tuesday January 13, 8:00:
Solenoid = Reverse
Toroid = Reverse
from Tuesday January 20, 8:00:
Solenoid = Reverse
Toroid = Forward
See also
Magnet Operations
|
|
The default global trigger list is
global_CMT-12.32.xml
Rules for Changing Prescales:
choose the prescale set which has a name closest to the luminosity at the start of the run.
Available prescale sets for the above trigger are:
02E30, 05E30, 08E30, 10E30, 13E30, 17E30, 20E30, 25E30,
30E30, 35E30, 40E30, 45E30, 50E30, 60E30, 70E30, 80E30, and scraping.
If help is needed with additional prescales, contact the Triggermeisters.
In this configuration, we see typical L1/L2/L3 accept rates of 600-1400/300-800/30-60 Hz,
depending on the instantaneous luminosity and prescale set.
If the rates are too high - L1>1500 or L2>850 or L3>65 Hz -
or the global FEB exceeds 10%: contact the Triggermeister.
A good effort should be made to keep the average global FEB rate below 6%.
Recorded Physics Run Limit:
4 hours or
instantaneous rate in Taker < 25 Hz
|
|
All Captain, DAQ and SMT shifts are 24/7.
Other shifters can be on-call:
- if there is no Store,
- if MCR states there is no shot setup expected for 4 or more hours,
- if the situation with the sub-detector is stable,
- if there are no sub-detector tasks to perform (checklist, calibration,
special runs, monitoring), and
- if the Shift Captain is in agreement
Calorimeter, Muon and CFT Shifters do not need confirmation from their
sub-detector coordinators. However,
there are
Special Instructions for Muon Shifters and
Special Instructions for CFT/CPS/FPS Shifters which must be followed before leaving.
Shifters must report in with the Shift Captain to give a contact number before leaving.
|
|
Global Monitoring (GM) is being coordinated by
Michiel Sanders and Elliot Cheu.
The GM console, d0ol33, is reserved for the GM shifter during
scheduled shifts when there is beam.
Useful information, numbers and plots should be inserted into the
electronic logbook under the GM tab.
The name of an institution will be listed
next to the GM shifter when the Global Monitoring shift is being run remotely.
There is a GM Web Communicator GUI to be used by the Shift Captain,
remote GM Shifter, and other shifters as needed. The interface is
very simple; shifters communicate via typed text. The gui should be
open by default on the Captain console. If not, the gui can be launched with
the following command sequence: setup d0online; start_daq gmwebcom.
The Shift Captain is running the vertex examine (currently
on d0ol27). Michiel Sanders has documented the Vertex Examine Instructions
(pdf
and html).
For reference, look at the VE plots entered in the logbook during previous shifts.
|
|
During non-colliding beam, the
zero_bias_4L1L2L3MP-1.00.xml trigger
should be run with all available crates to exercise the DAQ as long
as this does not conflict with commissioning or calibration efforts.
By default, 'Recording' should be ON as we would like to monitor
the full data path from the detectors to tape at the Feynman Computing Center.
There are three trigger bits with prescales which have been tuned both to exercise
the L1, L2 and L3 rates and to send an average of 1 Hz to tape, and a low rate L3 mark
and pass trigger that writes to the monitor stream. The prescales should
only be changed by or with approval of the triggermeisters.
If there is a request for cosmic ray data: the default cosmics trigger list is
official/special/cosmics-3.00.xml.
If the CTT is available,
official/special/cosmics_trk-1.00.xml
can also be used.
|
|