- Run Plan is "stack and store".
Collect quality data with the full detector in readout.
Commissioning activities should occur between stores, unless
approved by the run coordinator.
Between stores, collect zero-bias data with as much of the detector
as possible.
- We are currently not inserting the FPD pots.
-
We had been incurring into L3 disables at luminosities above about 50E30.
We got 29 new L3 nodes online which should fix the issue.
Try to run the default prescales.
If L3 disables appear:
- Usually the L3 disable drops much faster than luminosity.
If the L3 disable is more than 15% for more than a few minutes,
switch to a higher prescale set.
- Notify the on-call trigger meister if the L3 disables do not go away after 30min or are
still present at luminosities below 50E30 and L3 input rates below 600Hz.
- Below 50E30 the usual rules for prescales apply.
- Any configuration change of a system needs to be approved by the Run Coordinator.
- The Shift Captain should follow the MCR e-log and call MCR as needed
to keep up with the schedule of the AD.
MCR may give D0 quiet time or a Controlled Access.
Get approval from the run coordinator for a Controlled Access.
See the white board for Controlled Access requests (ask the Run Coordinator about approved work).
- Please read the
D0 Logbook before your shift in order to be better prepared.
|
Magnet ramps must be approved by the Run Coordinator.
from Monday December 20, 0800 :
Solenoid = Reverse
Toroid = Forward
from Monday December 27, 0800 :
Solenoid = Reverse
Toroid = Reverse
from Monday January 3, 0800 :
Solenoid = Reverse
Toroid = Forward
See also
Magnet Operations
|
|
The default global trigger list is
global_CMT-13.30.xml
Rules for Selecting Prescales:
The prescale files for V13 have names with luminosity ranges.
Choose the prescale file for which the luminosity at the beginning of the run is within that range.
The luminosity may fall below the lower bound during the run.
Unless instructed otherwise by the trigger meisters, do not start a run with an initial luminosity not inside the correct prescale set.
Available prescale sets for the above trigger are:
00-10E30, 10-15E30, 15-20E30, 20-25E30, 25-30E30, 30-35E30, 35-40E30, 40-45E30,
45-50E30, 50-55E30, 55-60E30, 60-70E30, 70-80E30, 80-90E30, 90-100E30 and scraping
If help is needed with additional prescales, contact the Triggermeister.
In this configuration, we should see typical L1/L2/L3 accept rates of 300-1600/200-850/30-60 Hz,
depending on the instantaneous luminosity and prescale set.
If the rates are too high - L1>1700 or L2>900 or L3>65 Hz -
or the global FEB exceeds 10%: page the Triggermeister.
A good effort should be made to keep the global FEB rate below 7%.
Recorded Physics Run Limit:
- default 4 hours
- or 2 hours with prescale 80-100E30, 70-80E30, 60-70E30, 55-60E30 and 50-55E30
- or change prescale if the instantaneous rate in the Taker is < 25 Hz
|
|
All Captain, DAQ and SMT shifts are 24/7.
Other shifters can be on-call:
- if there is no Store,
- if MCR states there is no shot setup expected for 4 or more hours,
- if the situation with the sub-detector is stable,
- if there are no sub-detector tasks to perform (checklist, calibration,
special runs, monitoring), and
- if the Shift Captain is in agreement
Calorimeter, Muon and CFT Shifters do not need confirmation from their
sub-detector coordinators. However,
there are
Special Instructions for Muon Shifters and
Special Instructions for CFT/CPS/FPS Shifters which must be followed before leaving.
Shifters must report in with the Shift Captain to give a contact number before leaving.
|
|
Global Monitoring (GM) is being coordinated by
Michiel Sanders and Elliot Cheu.
The GM console, d0ol33, is reserved for the GM shifter during
scheduled shifts when there is beam.
Useful information, numbers and plots should be inserted into the
electronic logbook under the GM tab.
The name of an institution will be listed
next to the GM shifter when the Global Monitoring shift is being run remotely.
There is a GM Web Communicator GUI to be used by the Shift Captain,
remote GM Shifter, and other shifters as needed. The interface is
very simple; shifters communicate via typed text. The gui should be
open by default on the Captain console. If not, the gui can be launched with
the following command sequence: setup d0online; start_daq gmwebcom.
The Shift Captain is running the vertex examine (currently
on d0ol27). Michiel Sanders has documented the Vertex Examine Instructions
(pdf
and html).
For reference, look at the VE plots entered in the logbook during previous shifts.
|
|
During non-colliding beam, the
zero_bias_4L1L2L3MP-1.01.xml trigger
should be run with all available crates to exercise the DAQ.
By default, 'Recording' should be ON as we would like to monitor
the full data path from the detectors to tape at the Feynman Computing Center.
There are three trigger bits with prescales which have been tuned both to exercise
the L1, L2 and L3 rates and to send an average of 1 Hz to tape, and a low rate L3 mark
and pass trigger that writes to the monitor stream. The prescales should
only be changed by or with approval of the triggermeisters.
If there is a request for cosmic ray data: the default cosmics trigger list is
official/special/cosmics-3.10.xml.
|
|