Links:
D0 Operations
D0 at Work
Shift Captain
DAQ Shifters
Archives
Run Database
Rates for Current Store
Luminosity Reports
Run II Bests
daqAI
DZero ACNET
Photos
D0 Restricted:
Stores and Runs
MCR & CDF:
Beam Status (Ch 13)
MCR E-log
CDF E-log
AD Run Coordinator
Plots:
D0 Integrated Luminosity
D0 Efficiency (monthly)
D0 Efficiency (daily)
D0 Weekly Summary
D0 Monthly Summary
|
- Run Plan - Make sure that the detector is in the best shape for
physics running. Run zero bias during non-beam conditions
and the global trigger during the store.
- LED sign - We are having a problem setting the SMT/FPD section
of the LED sign. The online group is working on it. If
you have questions about the status of the SMT HV, please
consult the SMT shifter.
- SCLinit for X13 - During some runs we are experiencing higher
levels of SCLinits for crate x13. This can occur when
the FPD pots are in their operating position.
This is not a problem
unless the SCLinits become more frequent or x13 can not be
fixed by an SCLinit. If there are more than 10 SCLinits
per hour, you should contact the run coordinator.
- If during the shot setup or as soon as you know that the luminosity will be greater than 130E30, page the level2 expert.
-
DAQ Rates -
- We are presently running with two additional triggers for
calorimeter calibration. These triggers write to the monitor stream
and may cause the monitor stream to be more than 20% of the total
rate. This is acceptable. This may cause our total L3 rate to be
in excess of 70 Hz.
- The total rate for any stream should be kept below 50 Hz.
- An exception is given for Luminosities below 40E30 where the
rate in the ALL stream may go to 60 Hz.
- If a given stream exceeds its allowed maximum rate by more than 10%,
you should go up by one prescale file.
- Anytime the L3 rate exceeds the
maximum, please check for hot cells and email the triggermeisters
and run coordinators.
- Any configuration change of a system needs to be approved by the Run Coordinator.
- Test Runs:
All test runs that are taken during physics should be approved
by the run coordinator. All starts and stops of test runs should
be kept to a minimum. The DAQ shifter and captain should be informed
before any start of a test run. Any test runs that interfere with
data taking should be stopped.
- Starting a parallel run that reads out Cal crates:
When a global run is in progress and a second run that reads out the Cal
crates, such as a FPD special run and a L1Cal2b special run, is going
to be taken, the global run must be
paused first and the second run started. After the second run is started, the
global run can be resumed.
- The Shift Captain should follow the AD Run Coordinator and
MCR e-logs and call MCR as needed
to keep up with the schedule of the AD.
MCR may give D0 quiet time or a Controlled Access.
Get approval from the run coordinator before requesting a
Controlled Access or quiet time.
See the white board for Controlled Access requests (ask the
Run Coordinator about approved work).
- Please read the
D0 Logbook before your shift in order to be better prepared.
|
Magnet ramps must be approved by the Run Coordinator.
since Friday February 17, 2006 :
Solenoid = Forward
Toroid = Forward
We will change polarities twice each month, normally
when the magnets already need to
be ramped down. This still requires run coordinator approval. The next
change will be around 27 February and the polarity set will be:
Solenoid = off
Toroid = off
See also
Magnet Operations
|
|
The default global trigger list is
global_CMT-14.93.xml
Rules for Selecting Prescales:
The prescale files have names with luminosity ranges.
Choose the prescale file for which the luminosity at the beginning of the run is within that range.
The luminosity may fall below the lower bound during the run.
Unless instructed otherwise by the trigger meisters, do not start a run with an initial luminosity not inside the correct prescale set.
Available prescale sets for the above trigger are:
00-10E30, 10-15E30, 15-20E30, 20-25E30, 25-30E30, 30-35E30, 35-40E30,
40-45E30, 45-50E30, 50-55E30, 55-60E30, 60-68E30, 68-76E30, 76-84E30,
84-92E30, 92-100E30, 100-108E30, 108-116E30, 116-124E30, 124-132E30,
132-140E30, 140-150E30, 150-160E30, 160_and_up and scraping
If help is needed with additional prescales, contact the Triggermeister.
In this configuration, we should see typical L1/L2/L3 accept rates
of 300-1600/200-850/30-60 Hz,
depending on the instantaneous luminosity and prescale set.
If the rates are too high - L1>1700 or L2>900 or
L3>60 Hz (high luminosity) or 75 Hz (low luminosity) -
or the global FEB exceeds 10%: page the Triggermeister.
A good effort should be made to keep the global FEB rate below 7%.
Anytime the L3 disables are above 15%, change to the next higher prescale set.
Recorded Physics Run Limit:
- default 4 hours
- or 2 hours with a prescale set that is greater than 50E30.
- or change prescale if the instantaneous rate in the Taker is < 25 Hz
|
|
All Captain, DAQ and SMT shifts are 24/7.
Other shifters can be on-call:
- if there is no Store,
- if MCR states there is no shot setup expected for 4 or more hours,
- if the situation with the sub-detector is stable,
- if there are no sub-detector tasks to perform (checklist, calibration,
special runs, monitoring), and
- if the Shift Captain is in agreement
Muon and CFT Shifters do not need confirmation from their
sub-detector coordinators. However,
there are
Special Instructions for Muon Shifters and
Special Instructions for CFT/CPS/FPS Shifters which must be followed
before leaving. Calorimeter and SMT sub-detector coordinators would
need to be contacted before their shifter goes on call.
Shifters must report in with the Shift Captain to give a contact number before leaving.
|
|
Global Monitoring (GM) is now performed by the shift captain.
Global Monitoring is being coordinated by
Md Naimuddin and Elliot Cheu.
The GM console, d0ol33, is reserved for the GM tasks during the colliding beam operations.
Useful information, numbers and plots should be inserted into the
electronic logbook under the GM tab.
The vertex examine runs automatically (currently on d0ol77) and the Shift
Captain looks at the plots. Michiel Sanders has documented the Vertex Examine.
For reference, look at the VE plots entered in the logbook during
previous shifts.
|
|
During non-colliding beam, the
zero_bias_4L1L2L3MP-1.01.xml trigger
should be run with all available crates to exercise the DAQ.
By default, 'Recording' should be ON as we would like to monitor
the full data path from the detectors to tape at the Feynman Computing Center.
There are three trigger bits with prescales which have been tuned both to exercise
the L1, L2 and L3 rates and to send an average of 1 Hz to tape, and a low rate L3 mark
and pass trigger that writes to the monitor stream. The prescales should
only be changed by or with approval of the triggermeisters.
If there is a request for cosmic ray data: the default cosmics trigger list is
official/special/cosmics-3.10.xml.
|
|