Conceptual design
(Marvin Johnson March 1997)

1/6 of detector in one crate

total cost about 660k$ (880 k$ for no-crack design)

Time budget

start at L1 accept:

 
		 task  		    time (microseconds)
	

CFT tracks on J3 bus  0.3

SVX read-out  7

hitfinding during read-out  0

put data via VME into DSP 15

compute track parameters 18

transfer to global L2 10

total 50