Conceptual design
(Marvin Johnson March 1997)
1/6 of detector in one crate
total cost about 660k$ (880 k$ for no-crack design)
Time budget
start at L1 accept:
task time (microseconds)CFT tracks on J3 bus 0.3
SVX read-out 7
hitfinding during read-out 0
put data via VME into DSP 15
compute track parameters 18
transfer to global L2 10
total 50