Old STT design notes
STTpp design meetings
"Old" (1998 and earlier) Documents about STTpp hardware
- DØ Run 2
trigger description
(invited talk by Jerry Blazey at the 10th Real Time
Conference, Beaune, 1997)
- "preliminary design" (excerpt from
DØ note 2984 describing first conceptual design)
- Block diagram of Silicon impact parameter trigger
- (M. Johnson, May 1996) (57kB), as described in DØ note 2984
- Marvin Johnson's answers to questions
from Saclay, 31 Jan 1997 (postscript, 14kB)
- DØ note 3168 by R. Angstadt and M.
Johnson,
- on a possible hardware implementation of cluster finding
by weighted averaging
- (24 Jan 1997) (postscript, 666kB)
- SVT design considerations
(Marvin Johnson, March 1997)
- DØ note 3209 by Henryk Piekarz
(03/21/1997) (without figures) (postscript, 108kB)
"A preliminary consideration of hit finders for the DØ impact
parameter trigger"
- Fig.3
- Fig.9
- conceptual design (March 1997) (Marvin
Johnson)
- description, time budget
html
--- ps
- STT scope (Horst's wishlist 25 Sept. 1997)
--- ps
- Marvin Johnson's comments to this
list
- note by Uli Heintz (30 Oct. 1997)
about hitfinding and other design questions
- Fred's
homepage
- (has links to CFT related documents:
-
DØ note 3082: CFT baseline design
-
DØ note 30xx: new design of CFT L1 and L2 trigger (6 Nov. 1997)
-
DØ note 30xx: revised design for CFT track finding (6 Nov. 1997)
- Note (24 Nov.1997)
from Marvin Johnson
- about STT lay-out and matching of STT sectors to CFT
sectors
- STT specs
(from Ulrich Heintz, Nov. 1997)
- DØ note 3363: "Road definition
for silicon track trigger"
by Ulrich Heintz (3 Dec. 1997)
- STT conceptual design(draft of note by Marvin Johnson, 6 Feb. 1998)
- ( pdf file )
- outline of TDR for STT
(Ulrich Heintz, 19 Feb. 1998)
- note by U.Heintz on
losses due to CFT L1 scheme proposed in the note by Marvin
- DØ note 3168: STT conceptual design (updated note by Marvin Johnson, 3 March 1998)
- ( pdf file )
- ( ps file )
-
Draft of technical design report
- very preliminary
- note about data
flow (Meenakshi Narain, 7 March 1998)
- L2 preprocessors
with FIC, SLIC, MBT
-
"Modest STT proposal" (Mike Fortner)
- answers to questions of
review panel (4 - 10 April 1998)
- L2 workshop ground rules and
goals (Jim Linnemann, 13 - 15 April 1998)
- DØ note 3492 (
Terry Heuring's note on queueing studies) (26 June 1998)
-
effect of new anchoring in CFT (Note by Ulrich Heintz 4 July 1998)
- summary of findings
- John Hobbs' hit
selection studies (hits/layer and number of combinations as functions of road width for four
standard data samples) (10 Sept. 1998)
-
allowed trajectories vs CFT information (John Hobbs, 17 Dec. 1998)
back to STT design page
back to STT homepage

last updated 12 April 1999