Some useful information:
- DØ note 2984 , (previous) working group
report on a vertex trigger for run II (30 June 1996) (695kB)
- Block diagram of SVT preprocessor
(M. Johnson, May 1996) (57kB)
- DØ note 2350 , "An Impact Parameter Trigger
Algorithm for the DØ - beta Detector", By J. Drinkard and D. Stoker (Nov.1994);
(630kB)
- DØ note 2730 (draft), Draft of John
Drinkard's DØ note about SiVtx GEANT simulation:
"A Simulation Package for the DØ Silicon Tracker"; (1.6MB)
- Transparencies of a talk given by Fred
Borcherding about L2 Tracking Preprocessor (79kB)
- a paper by Fred Borcherding, "The Impact of a Displaced Vertex Trigger on
the CFT L1 Axial Trigger" can be found
here
(you might have problems viewing it by ghostview, but it can be printed OK)
- Transparencies of a talk
by Rafael Gomez about "CFT efficiency for tracks from b decays" (10/17);
(930kB)
-
presentation by Fred Borcherding at upgrade trigger meeting Nov.20
- Note by Phil Gutierrez about
tracking algorithm in trigger ntuples (01/10/97) (740kB)
- Marvin Johnson's answers to questions
from Saclay, 31 Jan 1997 (14kB)
- DØ note 3168 by R. Angstadt and M.
Johnson, on a possible hardware implementation of cluster finding
by weighted averaging (24 Jan 1997) (666kB)
- Update on trackfinding and SVT trigger ntuples
(Phil Gutierrez, 01/31/97) (39kB)
- SVT overview (talk by Phil
Gutierrez at Si meeting, Feb. 1997) (188kB)
- SVT group status report given by Horst Wahl at collaboration meeting 03/07/1997
- html
- postscript (124kB)
- DØ note 3209 by Henryk Piekarz
(03/21/1997) (without figures) (postscript, 108kB)
"A preliminary consideration of hit finders for the DØ impact
parameter trigger"
- Fig.3
- Fig.9
- Conceptual design of Si vertex
trigger"
(Marvin Johnson, March 1997)
- uv trigger working
group report (Drew Baden, 28 April 1997) (link to postscript file,
280kB)
- Update on beam position and SVT trigger
(Note by Andrew Brandt, 05/16/1997)
- SVT status report 29 August 1997
- (Talk given by Horst Wahl at trigger meeting, 29 August 1997)
- (incomplete -- some slides and all figures missing)
- SVT status report 5 September 1997
- (talk at upgrade meeting 5 Sept. 1997)
- (incomplete -- some slides and all figures missing)
- Silicon track
trigger for runII (talk given by Meenakshi Narain at collaboration
meeting 1 Oct. 1997)
last updated 27 July 1999
Horst Wahl