Notes within DØ
Postscript files have been compressed. From a UNIX plattform,
transform them into a readable postscript by: "gzip -d file_name.ps.gz"
APS conference, Washington, April 18,1997:
"Minimizing the uncertainty due to
parton distribution and production mechanism
in the
determination of the W mass"
standard ps file:(ps)
DØ Workshop, Fermilab February 99
"J/Psi --> e-e+ at Dzero (Run II)"
Conference talk:
(ps)
SUSY-Higgs Workshop, Fermilab, Nov. 6, 1998
"Search for h-->W*W* with W*W*-->lnu jj
at the TeVatron Run II "
Abstract (ps file)
standard ps file (ps) (18 p.)
Beauty'99 Conference, Bled, Slovenia, June 22, 1999
"B Physics with the D0 Detector Upgrade"
Abstract........: Abstract.txt
Talk (.ppt).....: in \\d0server1\users\lucotte\Presentations\Beauty_99
Talk (.ps.gz)..: Detector-Tracker-Vertex-PreShower-Muon-Trigger
Article..........: (ps.gz)
List of Figures (post-script files):
Figure 1: Dzero Upgrade Detector
Figure 2:The new Dzero Tracking System
Figure 3:Momentum resolution
Figure 4:L1 and L2 Trigger Structure
Figure 5:L1 and L2 electron trigger
Figure 6:Dielectron Invariant Mass at L2
Conference Talk (powerpoint): d0server1/users/lucotte/Presentations/beauty99.ps.gz
(1) Bloomington 20/25-JUL-97 .................................... (ps file)
(2) DØtrg meeting 07-JAN-98 ..................................... (ps file)
(3) DØ trigger meeting 20-FEB-98.............................. (minutes)
(4) DØ FPS Review 26-FEB-98................................... (ps)
(5) DOE Review 01-JUL-98:
"L1 and L2 trigger with the FPS at DØ"(ps.gz)
(6) DØ Workshop 07-JUL-98:
"L1 and L2 trigger with the FPS and CPS" (ps.gz)
(7) DØ Workshop 25-SEP-98:
"L1 J/psi trigger with the FPS" (ps)
(8) DØ Workshop 15-OCT-98:
"L1 and L2 J/psi trigger with the FPS" (ps)
(9) DØ Trigger Review 22-JAN-99:
"L1 Trigger with CPS/FPS:Physics Motivations and algorithms" (ps)
(10) Paris Trigger Workshop 12-MAR-99:
"Proposition for calorimeter and tracking terms extensions" (ps.gz)
(11) DØ Trigger Meeting 15-APR-99
:
"CAL CFT/PS Quadrant Matching at Level 1" (ps)