FISCAL YEAR 2001 REQUIREMENTS
- Safe assembly and operation will require significant technical and engineering staff:
- Estimate 2 FTEs of technical support:
- Designs and drawings
- Procurement liaison
- Mechanical engineer
- Electrical technicians
- Machinists
- Cryogenic engineers
- Significant material and equipment requirements
- Refrigeration
- Absorber assembly (2 prototypes)
- Windows fabrication
- Support structures
- Instrumentation/controls