AFE Board Phase-5 Testing
Board 544 processed Dec 2002
Latest Version of
AFE Note
Latest Bad Channel Plots (July 30, 2002)
:
-
Installed Boards
-
All Boards
Latest Bad Channel Lists
:
-
Installed Boards
-
All Boards
Plots of Latest SVX/SIFT Gain Distributions and Pedestals :
- Pedestals (
All
) (
Installed
)
- SVX Gains (
All
) (
Installed
)
- SIFT Gains (
All
) (
Installed
)
Working version of Spreadsheet from phase-5 data analysis
(Jan. 10)
Detailed Spreadsheet from phase-5 Offline data analysis
(October 30)
Phase-5 Spreadsheet from Jesik
Plots of No. of Bad Channels
1
,
2
Plots of No. of Bad Channels
Installed Boards: Axial
Some Example Plots:
Vref Scans :
560480
,
560495
,
560506
,
560579
,
560516
SVX Gains : Fit Results
More SVX Gains
Pedestals and their sigmas
Discriminator Thresholds (Board 560516)
September 26
560465 Fit Gains
,
560465 Gain dist.,
Fit for ch. 1014
October
560500 AllGains
,
560500 bad channels
560512.ps
This Page maintained by Pushpa Bhat (pushpa@fnal.gov)