SOME MAGNET PICTURES/GRAPHICS
Perspective of The Upgrade Detector (63K)
Calculated Fluxplot of Solenoid (110K)
Solenoid Installed in the Central Calorimeter 09/98 (446K)
Fieldmapper in the Solenoid 09/98 (451K)
Fieldmapper Hall Probe Carriage 09/98 (171K)
Solenoid Control Dewar Platform 09/98 (276K)
Solenoid in DAB Cleanroom 01/98 (451K)
D0 Helium Refrigerator 06/97 (216K)
Solenoid Arrival at DAB from Toshiba Keihin Works, Japan 05/97 (94K)
Fieldmapper at Toshiba 03/97 (230K)
Return to Solenoid Page
Last Modified: 28 Oct 1998
rpsmith@fnal.gov